The calculator

The simplest way to make a preliminary repair/replace decision is to use the calculator shown in Figure 2. Here is how it works. First determine the following:

  • Annual running hours for the motor application (HA)
  • Local energy cost, in $/kWh (E)
  • Efficiency change, in % (FNEW – FREPAIR)
  • Cost of repair, in $ (CR)
  • Cost of a new motor, in $ (CN)
  • and insert the values in the following equation: 
  • Decision coefficient = HA • E • (FNEW – FREPAIR) • CR/CN 

The Replace/Repair Calculator is an empirical index to enable motor users to estimate whether to replace or repair an existing motor that has failed or is about to fail. Courtesy: Integrated Power ServicesFor example, assume that a 100 hp, 3,000 hr energy-efficient motor is showing signs of failure. Energy cost is $0.09 from the local utility. Also, conservatively estimate that if the motor is rewound, it will lose 1% efficiency, from 95.5% for the new one to 94.5%. Cost of rewinding is $2,600, and a new replacement costs $8,800. Should it be rewound or replaced? 

Decision coefficient = 3,000 • 0.09 • 1 • 2,600 /8,800 = 79.77 

On the calculator, this figure falls well within the “repair” region. On the other hand, had the motor run another 1,500 hours and been located in an area where energy costs are $0.13, then the answer would have been right at the breakpoint. 

This equation shows the overriding importance of efficiency. By simply changing the efficiency shift from 1 to 2, the coefficient doubles. Also, the equation is conservative in that it does not include an escalator factor for increases in power costs—which, like death and taxes, are a certainty. Thus, if the calculator indicates that the repair/replace decision is near the breakpoint, the wise choice would be to replace the motor to take advantage of the new motor’s greater efficiency as power costs increase. 

Decisions on dc motors

Not all motors show such graphic evidence of failure, but when the time comes to repair or replace a motor, making a cost-efficient choice can provide the best long-term solution. Courtesy: Integrated Power ServicesThe dc machine is, as the saying goes, a different animal. Except for bearings, its wear points are different than those of ac machines and it’s much more expensive to build—by a factor of 2 to 4, depending on its design. Likewise, dc machines are somewhat more expensive to repair than ac units, but not by a factor of 4 unless the commutator and armature are completely destroyed.

Large dc machines cling to those specialized applications where extremely precise control of speed is paramount, or where it is possible to use a regenerative drive to recapture a portion of the energy already invested in the rotating mechanism. Other than that, dc technology has been shouldered aside by ac, and large dc motors have become relegated to those applications where nothing else can be controlled as precisely.

Repair/replace decisions for dc are usually simpler than those for ac because there is no premium efficiency line manufactured. Also, because the motors are more expensive to manufacture, users tend to hold onto them longer. For dc machines, the repair/replace breakpoint tends to be higher than that for ac, about 65% the price of a new unit.


<< First < Previous 1 2 Next > Last >>

FUJI , KS, United States, 06/06/13 11:55 AM:

This is a very good artical for plant team to learn. Fuji Wu.
VILLALAN , Non-US/Not Applicable, Malaysia, 06/06/13 09:38 PM:

Very informative. Dr.Villa
BILL , VA, United States, 06/07/13 08:16 AM:

thanks for the insight
GEORGE , TX, United States, 07/18/13 12:52 PM:

Good article.
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.