Modeling natural ventilation

Energy modeling for LEED submission was done on a recent project in which natural ventilation and a radiant floor cooling system were proposed for the dining area of a food court in a local university in Southern California.

Erin McConahey, PE, Arup, Los Angeles

09/24/2012


The EQuest systems configuration screen does not represent true system configuration. Courtesy: EQuest, version 3.64Energy modeling for U.S. Green Building Council LEED submission was done on a recent project in which natural ventilation and a radiant floor cooling system were proposed for the dining area of a food court in a local university in Southern California. EQuest was used because it was the most appropriate software at the time, but its developers did not envision such a building, so “workarounds” had to be created to mimic the actual energy use of the building.

Because the design incorporated a mixed-mode approach, and none of the currently available engines allows for multiple systems serving the same space, it was necessary to create the radiant systems as serving “dummy” zones with simulated cooling coils served by fans with 0.0001 kW/cfm energy (because zeroing out fan energy in EQuest can cause instability). Furthermore, it was necessary to perform a dynamic heat transfer analysis in an alternate program to represent a schedule of operation to represent when the natural ventilation was active (in the typical meteorological year file) and when the air conditioning units had to be scheduled to be on for the primary zone.

As shown in Figure 3, there is no way graphically to represent the systems based on the available components in the Schematic Design Wizard. However, with the detailed modules of EQuest and a substantial amount of review of the *.sim files, it was possible to get a reasonably good representation of the energy performance. This was an improvement on the manipulation of baseboard heating modules to simulate radiant floor heating and allowed the computation of cooling energy. While EQuest does have a natural ventilation capability, the complexity of changeover systems for mixed mode approaches did require the heavier manual manipulation of files to represent all of the energy components adequately and meet the expectations of the LEED reviewer panel.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
2013 Forecast Issue: A shift in manufacturing
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results


Poll of the Week

What category most helps you select new products?
Recommendation from colleagues
Product of the Year winners
Supplier information
Trade show visit


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.