Microgrids: Consulting-specifying engineers must be ready

Microgrids appear poised for a wide adoption. As a result, consulting-specifying engineers should be aware of how microgrids affect substation designs in commercial and industrial applications.

04/11/2014


Microgrids are typically grid-tied entities that balance and even orchestrate multiple-generation sources (often including distributed generation) and multiple loads. One major advantage is that microgrids can “island” themselves from the grid, when the latter is experiencing faults, voltage volatility, or other power quality-related disturbances. 

When designing a substation for a commercial and/or industrial facility that intends to become part of a microgrid – or wants to preserve that option in the future – certain specifications and considerations must be addressed early on in the process. This is particularly true if the microgrid owner/operator seeks to put excess power back onto the grid. 

In fact, early consideration of a microgrid can be cost-effective for an organization. Working the needed equipment into the substation design prior to adopting a microgrid can be a cost-effective way to keep an organization's options open. Retrofitting after the fact is much more expensive and less optimal in practice. 

The consulting-specifying engineer should utilize the IEEE 1547 "Standard for Interconnecting Distributed Resources with Electric Power Systems." The IEEE 1547 series defines interface points, which are points to be monitored and metered. In addition, the standards provide protection and control strategies for substations handling a bi-directional flow of power. These standards are currently being further developed in recognition of the widespread interest in microgrid capabilities. Utilities are beginning to design the grid in a way that recognizes all loads beyond merely the interconnection with the microgrid, and they will be supported by a microgrid’s generation sources. 

Courtesy: CFE MediaThe IEEE 1547 series of standards will provide the consulting-specifying engineer with the knowledge they need to address substation design in fields such as equipment, monitoring, wiring, and metering. Just as an electrical grid needs a supervisory control and data acquisition (SCADA) system and a control room, a microgrid requires a control center of sorts, which could be just a PC on a desk. But generation sources need to be matched to loads, regardless of a microgrid’s scale. Perhaps loads are increased or reduced to match current generation output, but the two sides must be matched.

The consulting-specifying engineer needs two controlling technologies in the substation in the form of remote terminal units (RTUs). First is for the utility, and the second is for the microgrid owner/operator and the “control center.” This provides the utility with data on the microgrid’s status. If the microgrid islands itself, the utility’s grid must adjust for the drop-off in load. 

In fact, if the facility plans to oversize its distributed generation capacity to inject excess power back onto the grid through net metering, then substation design must accommodate the bi-directional flow of power. The objective is to address the utility’s need for situational awareness, meaning the visibility it needs to monitor and manage how that bi-directional flow affects its grid. The consulting-specifying engineer must design for a greater degree of instrumentation in a substation that will handle a bi-directional flow of power. The design depends on scale. If the bi-directional flow never exceeds 1 to 2 MW, situational awareness is achieved in a specific manner. If the scale of bi-directional power is in the 100 to 200 MW range, however, a different set of design considerations apply.

The consulting specifying engineer must also understand the local utility’s requirements for situational awareness. For example, what data points does the utility require for its own monitoring, control, and protection schemes? If this is not assessed and addressed early on in the design process, unanticipated costs are likely to crop up later. The consulting-specifying engineer may even play the role of a mediator between client and utility in this context.

Utility requirements for the substation may be specific, extending down to the level of vendor and device. For situational awareness, a utility may require specific RTUs and specific protocols to integrate with its supervisory control and data acquisition (SCADA) and energy management system. At transmission-level voltages, the utility may require specific protective relay equipment. Utility line crews may need to access the substation in question to confirm that no power will flow while they’re working. Thus, utility-side needs will influence the physical design of the consulting engineer client’s substation, even the access controls. 

Given the cost-effectiveness of addressing these issues up-front in the substation design for the client, and the critical nature of utility concerns that must be met, the consulting-specifying engineer is well-advised to begin these conversations at the earliest opportunity. 

Sam Sciacca is an active senior member in the IEEE and the International Electrotechnical Commission (IEC) in the area of utility automation.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.