Manufacturer focus: Designing labs, research buildings

05/28/2013


CSE: Provide details about a recent lab project in which your company’s controls were specified. What unusual problems did these controls solve?

Schneider Electric: Schneider Electric recently completed energy upgrades at 13 buildings at North Carolina State University (NCSU) through an energy saving performance contract. One of those buildings was a chemistry laboratory, Dabney Hall. One hundred eleven fume hoods were converted from constant volume to variable volume and linked to a central building automation system (BAS). NCSU expects the total energy savings to exceed the cost of the performance contract. With an annual utility bill of more than $30 million, every bit of energy savings helps. For example, the university expects improvements in Dabney Hall’s research labs to yield 20% in energy savings for the entire project.

CSE: What types of integrated systems have clients requested recently? Describe the control systems, and how they were integrated?

Schneider Electric: On current Biosafety Level 4 (BSL-4) projects, it has been clear that our clients need better integration with the hardware and software of the specialty door systems. Almost everything about these projects is restricted, but better sub-system integration is a key area to achieving safety, security, and reliability. The two major door systems in use at BSL-4 are submarine type doors with turning wheels and also doors with pressurized bladders that inflate and deflate. 

CSE: What renewable electrical system projects have you recently provided products for? Describe the electrical/power systems, renewable energy issues, etc. 

Schneider Electric: I had the privilege of being on the authoring committee when Labs21 put together its EPC criteria for labs. Both that standard and the U.S. Green Building Council LEED rating system put an increasing emphasis on providing greater and greater percentages of renewable energy to the lab building. The main lesson learned in this area is that first you aggressively save energy with conservation. This makes your job of providing greater percentages of the building's power through renewable energy more cost effective. 

CSE: Labs21 is working to make labs and research facilities more sustainable. What’s your experience with electrical/power projects that use Labs21 as a guide? 

Schneider Electric: Schneider Electric has been very active with Labs21 for more than 10 years as members, speakers, trainers, sponsors, and co-authors of papers and best practices. The current guidance from Labs21 on reducing "vampire" loads and accurately predicting plug loads for lab buildings has helped improve some of our current projects. 

CSE: What standby or back-up power systems are engineers and their clients requesting? Describe a recent project. 

Schneider Electric: The emphasis at Schneider Electric for back-up power systems for labs has been adding automation specifically for operating the emergency generators. This software suite can diagnose and predict future faults for maintenance before a shut-down occurs. The emergency generator is the one piece of equipment which is never allowed to fail.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.
Electric motor power measurement and analysis: Understand the basics to drive greater efficiency; Selecting the right control chart; Linear position sensors gain acceptance
Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.