Maintenance avoids welding machine failures

By following a regimen of appropriate and thorough maintenance procedures, a welding machine can run safely and dependably for a long time. Bill Butler of Miller Electric Mfg. Co. and Mark Jacklin of Interstate Welding Sales Corp. explain how outsourcing can be a benefit and what steps inhouse maintenance can take to keep welding machines unning.

04/30/2002


Welding/Maintenance

By Bill Butler, Sales/Application Engineer, Miller Electric Mfg. Co., Appleton, WI, Mark Jacklin, Interstate Welding Sales Corp., Marinette,WI

Key concepts

Welding machines in poor repair waste money

Outsourcing provides expert maintenance

Because of their durability and long life, welding machines sometimes don’t get routine maintenance. For some companies, a broken welding machine is a minor interference. For those who rely heavily on welding, a broken machine can cause major headaches. It typically means expensive lost production. Welding machines with erratic arcs also waste energy. Welds that fail to pass x-ray, ultrasonic, or other tests are costly to repair.

Hard failures, such as blown PC boards or electrically “fried” components, are unpredictable. However, owners of welding equipment can directly control “soft failures” by repairing worn items, such as cables, connections, internal wiring, drive roll systems, guns, torches, and consumables. Preventing soft failures also includes removing corrosion and air-borne contaminates from the machine that lead to over-heating and circuit board failure.

Pressing deadlines and other priorities often cause delays in maintenance until it’s too late. If this is the case, strongly consider outsourcing maintenance to a qualified source.

Preventable cost efficiency

The premise behind outsourcing maintenance is that manufacturers may not have the internal resources to perform maintenance, or their internal resources are already over-burdened with more pressing maintenance issues.

While some people may hesitate to outsource work because they perceive it costs more, calculating Preventable Cost Efficiency (PCE) can put actual numbers to the problem. PCE is a factor of the cost of production downtime per hour and the cost of service per hour. The following calculation illustrates the potential savings:

PCE = Cost of Maintenance/Hour

If a service provider charges $75/hour for service and downtime costs $500/hour, then the PCE is 15%. In other words, spend $15 for preventative maintenance now or pay $85 dollars to fix it later. Service experts believe that preventative maintenance generally reduces the chance of hard failures by up to 50%.

System Checklist

Before servicing equipment, unplug it; this includes all 115 V plugs from feeders and water coolers. Always follow established lock-out/tag-out procedures and follow the safety information in the operator's manual. Contact the manufacturer when in doubt.

The following is a basic list of service actions for most welding systems. For a complete, detailed list, consult the owner’s manual or an authorized service provider.


Fig. 1. Welding machines must be blown out regularly to maintain reliable performance.

Power sources. Approximately every six months use clean, dry air to blow out the inside of the machine. In heavy service conditions, cleaning monthly or weekly may be necessary (Fig. 1). For inverter-type machines, leave the cover on and direct the airflow through the front of the machine. Failing to blow out the machine can lead to overheating, erratic arc performance, board or electrical failure, and premature wear.

Load bank testing. Load test each machine to ensure the welding output is accurate, it is required for ISO compliance.

Cable connections, cables and electrode holders. Poor weld circuit connections can yield any number of problems. This includes excessive resistance in the weld circuit, which in turn leads to arc wandering, an arc that won’t start or an arc that is difficult to start.


Fig. 2. Inspect cables to ensure they are not damaged.

Frequently inspect all parts of the circuit. Tighten loose connections and inspect cables, electrode holders and ground leads for wear, cracks, and damage (Fig. 2). Immediately replace those with excessive wear or damage. Note that excess cable length and coiling cables around ferrous metal, such as a table leg or pipe, also causes erratic arcs and drifting weld parameters. Use quick disconnects to add or subtract cable as needed to avoid these problems.

Guns. A gun is not a hammer, but operators often use it as one. Banging may loosen connections inside the gun and lead to erratic arcs. Inspect guns every six months, tighten loose connections, and blow out any particles.

Cables and liners. Clean the cable assembly after finishing a spool of wire, or about twice a week. Disconnect the cable from the feeder and check for a secure connection. Blow out the cable, directing air into the contact tube end. Tap the cable every few feet to loosen any residue trapped in the liner and blow it out again.

Without regular cleaning, the liner will eventually clog and seize the wire. This causes feeding problems, typically slipping, that can cause the wire to burn back to the contact tube. This may cause a bird’s nest at the drive rolls. If the liner is cleaned and still there still are wire feed problems, the liner is likely worn and needs replacing.

Drive rolls. Inspect the drive rolls when the cable is cleaned. If dirty, remove and clean them with a wire brush. If deformed, replace them. In addition, check the inlet and outlet guides and replace them if they are deformed from wire wear. More pronounced wear on the inlet guide may indicate the need to realign the wire spool hub assembly.

Water coolers. Maintain proper coolant levels. Rather than water, use a blended coolant from the manufacturer. It solves problems related to sludge build-up and foaming.

Gas hoses. Porosity in the weld bead and poor bead color can result from insufficient shielding gas coverage. Examine hoses regularly for leaks, wear, and loose connections. Immerse pressured hose in water to check for leaks. Repair a leaky or worn hose by cutting out the damaged area and splicing. Do not use tape.

Regulators. Remove a faulty regulator from service for repair after closing the cylinder valve. External gas leaks, excessive creep (when delivery pressure continues to rise with the downstream valve closed) and faulty gauges (pointer does not move off the stop pin when pressurized, nor returns to the stop pin after pressure release) indicate a faulty regulator. Do not attempt to repair a faulty regulator; send it to the manufacturer’s designated repair center.

Engines on welding generators. Basic maintenance includes changing the oil, oil filter, air cleaner, and fuel filter. Check the owner’s manual for service intervals, as this varies greatly between gas and diesel engines.

Edited by Joseph L. Foszcz , Senior Editor, 630-320-7135

More info

For additional information on welding equipment maintenance, visit the company’s web site, millerwelds.com.





No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.