Machine Safety: Verification is not validation

Know the 5 steps of the functional safety lifecycle. To perform functional safety and comply with safety standards like ISO 13849-1 and ISO 13849-2, design engineers need to know how to perform verification and validation measures; they are not the same step.


To perform functional safety and comply with safety standards like ISO 13849-1 and 2, design engineers need to know how to perform verification and validation measures. But aren’t they the same step?

In the functional safety lifecycle, 1) Perform risk assessment, 2) Examine functional requirements, 3) Design and verify mitigation, 4) Install and validate, and 5) Manage, change, and improve. Courtesy: Control Engineering Machine Safety Blog, JB Titus & Associates

The most immediate answer is NO!

Best-in-class companies are generally adopting the “lifecycle” design model when approaching functional safety design requirements. An example is shown in this graphic of the functional safety lifecycle:

1) Perform risk assessment

2) Examine functional requirements

3) Design and verify mitigation

4) Install and validate

5) Manage, change, and improve.

ISO 13849-1 requires that during the design stage a verification step is performed (lifecycle step #3). For example, see clause 4.7 on page 26 of the standard [talking about Safety Related Parts of The Control System (SRP/CS)]:

4.7 Verification that achieved PL meets PLr

“For each individual safety function the PL of the related SRP/CS shall match the required performance level (PLr).... The PL of the different SRP/CS which are part of a safety function shall be greater than or equal to the required performance level (PLr) of this safety function.”

Validation is a different step. While verification is often performed by someone other than the original designer during the design phase, validation is performed during the build and/or installation stage (lifecycle step #4). The goal of validation is to acknowledge that the required safety function is actually achieved for any one hazard in all modes of operation. For example, see clause 8 on page 41 of the standard:

8 Validation

“The design of the SRP/CS shall be validated (see Figure 3). The validation shall demonstrate that the combination of SRP/CS providing each safety function meets all relevant requirements of this part of ISO 13849. For details of validation, see ISO 13849-2.”

The above requirements are for the safety related parts of the control system (SRP/CS) for a machine’s overall control system. Additionally, ISO 13849-1 and 2 also cover the software of a control system, which also includes requirements for verification and validation of application software for all safety functions.

It is my opinion that this information could help clear up possible confusion over the terms "verification" versus "validation" for functional safety applications. If you have additional understandings or clarifications please submit your ideas, experiences, and challenges in the comments section below.

Related articles linked in the text and the bottom of this post, follow:

The Safety Standards Maze, 3 Comments: More Standards, Validation

Machine Safety: safety system validation and daisy divination

Verification and validation by Lenze 

Contact: for “Solutions for Machine Safety”.

No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Sister act: Building on their father's legacy, a new generation moves Bales Metal Surface Solutions forward; Meet the 2015 Engineering Leaders Under 40
2015 Mid-Year Report: Manufacturing's newest tool: In a digital age, digits will play a key role in the plant of the future; Ethernet certification; Mitigate harmonics; World class maintenance
2015 Lubrication Guide: Green and gold in lubrication: Environmentally friendly fluids and sealing systems offer a new perspective
Drilling for Big Data: Managing the flow of information; Big data drilldown series: Challenge and opportunity; OT to IT: Creating a circle of improvement; Industry loses best workers, again
Pipeline vulnerabilities? Securing hydrocarbon transit; Predictive analytics hit the mainstream; Dirty pipelines decrease flow, production—pig your line; Ensuring pipeline physical and cyber security
Cyber security attack: The threat is real; Hacking O&G control systems: Understanding the cyber risk; The active cyber defense cycle
Designing positive-energy buildings; Ensuring power quality; Complying with NFPA 110; Minimizing arc flash hazards
Building high availability into industrial computers; Of key metrics and myth busting; The truth about five common VFD myths
New industrial buildings: Greener, cleaner, leaner; New building designs for industry; Take a new look at absorption cooling; Offshored jobs start to come back

Annual Salary Survey

After almost a decade of uncertainty, the confidence of plant floor managers is soaring. Even with a number of challenges and while implementing new technologies, there is a renewed sense of optimism among plant managers about their business and their future.

The respondents to the 2014 Plant Engineering Salary Survey come from throughout the U.S. and serve a variety of industries, but they are uniform in their optimism about manufacturing. This year’s survey found 79% consider manufacturing a secure career. That’s up from 75% in 2013 and significantly higher than the 63% figure when Plant Engineering first started asking that question a decade ago.

Read more: 2014 Salary Survey: Confidence rises amid the challenges

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.