Lenze taking ‘machine-up’ approach in customer center
New Illinois facility expands company’s capability to grow.
Bob Vavra, Content Manager, Plant Engineering
In mapping out the home for its new Mechanical Product Assembly & Logistics Center, Lenze Americas looked at its existing and potential customers and found what company president Chuck Edwards called “the center of our universe” – which turns out to be in Glendale Heights, Ill.
Lenze staged an opening for customers and employees for the 100,000 sq ft. facility on Sept. 25. Lenze has room to grow in the new facility, but that growth will be built around a logistical plan that takes advantage of the ability to assemble and ship from a central location.
“We can reduce shipping costs and cut our lead time, which will make us more responsive to our customer demands,” said Edwards. The facility will feature three business functions – electro-mechanical assembly for its mechanical drives, OEM business development, and the Midwest sales office.
“We are excited about the grand opening of our new facility in Glendale Heights,” said Gene Wood, director of operations, Lenze Americas. “The new Glendale Heights location gives Lenze Americas an even greater opportunity to meet the needs of our growing North America customer base. With greater capacity and capabilities, we are able to offer flexible services, reduced cost of delivery and expedited deliveries.”
Part of that process also is working with customers to make sure the machine performs as designed. In an age where mechatronics has seen control systems sometimes overwhelming machines, Edwards said Lenze, with a long tradition from the machining side, goes at the issue form the opposite direction.
“We’re working with the customer to optimize machine performance. As you begin to push the extremes, it becomes a physics question,” he said. “To understand physics, you have to approach it from the mechanical size up into the control system instead of from the control system on down.”
Case Study Database
Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.
These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.
Click here to visit the Case Study Database and upload your case study.
2012 Salary Survey
In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.
Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.












