The Kaleida Health, Clinical and Medical Research Building: Gates Vascular Institute (GVI), and UB Clinical Translational Research Center/Incubator (CTRC) forms the cornerstone of a new world-class health sciences campus focused on the regeneration of downtown Buffalo. The master plan creatively juxtaposes internal and external space to stimulate the essential collaborative spirit between researchers and clinicians that will accelerate discoveries into medical practice. Courtesy: K C Kratt Photography (Click to enlarge)Project name: Kaleida Health, Clinical and Medical Research Building

Location: Buffalo, N.Y.

Firm name: Cannon Design

Project type, building type: New construction, hospital

Project duration: 4 years

Project completion date: June 1, 2012

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $69.5 million

Engineering challenges

Kaleida Health, Clinical and Medical Research Building: Gates Vascular Institute (GVI), and UB Clinical Translational Research Center/Incubator (CTRC) Challenge: Create a hospital and translational research center with “100-year” flexibility. The GVI is a one-of-a-kind facility planned as the cornerstone of a world-class academic medical center being developed by Kaleida Health and the University at Buffalo, Buffalo 2020 Development Corporation. The $291 million, 476,000-sq-ft, 10-story facility consolidates services previously performed at two separate facilities, including cardiac catheterization, neurovascular intervention, electrophysiology, peripheral vascular intervention, cardiac surgery, neurosurgery, and peripheral vascular surgery—and provides the region with a major heart and vascular center. There is also an entire medical research facility with laboratories, imaging, a vivarium, and a research incubator.

Solutions

To maximize flexibility and create a “100-year building,” the facilities” structure and its engineering systems infrastructure is designed utilizing a Universal Grid, a 31-ft 6-in. x 31-ft 6-in. x 18-in. floor-to-floor structural system with “headered” mechanical and electrical systems distribution to accommodate future technologies in operating suites and conversion of building zones to entirely different functions without having to modify “head-end” mechanical, electrical, and plumbing systems.

The new facility is provided with steam, chilled water, electricity, and emergency power from an expanded central plant that serves the entire medical campus. We added 2,200 tons of chilled water capacity to the existing 3,700-ton chiller plant. Campus distribution loop systems were created for the steam and chilled water systems. The chiller plant is also being converted to a variable primary flow system with upgraded chiller optimization controls. Chilled water will be provided year-round, and a winter free-cooling heat exchanger was designed to provide up to 1,200 tons of winter free-cooling when outside air temperature is below 40 F. A 6-MW emergency generator plant is being constructed to provide full backup power for the new facility. The electrical systems’ design also included the phased upgrade of all primary electrical distribution serving the existing hospital to accommodate capacity for the new building, including expanding the 23 kV substation and replacing the secondary 5kV distribution switchgear and underground feeder ductbank relocations required to clear the area for the new building. Coordination meetings were held with National Grid Engineers to plan the physical expansion of the substation, including construction phasing, ductbank and feeder arrangements, and equipment selection and layout. Design work included protective relaying equipment, three-line diagrams, a coordination study, and short-circuit calculations.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.