1: Pre-plan your event

To most this step would seem obvious, but many people fail to remember that the most basic things can throw your event into a tailspin. To ensure that does not happen, develop the scope of the event with objectives, deliverables, and metrics; these are what will help determine if the event is successful. Make sure you have selected a team and booked the space where the event is going to take place. Having all the supplies pre-planned for the event, such as flip charts, Post-it notes, tape, and paint, will ensure that the most basic frustrations are eliminated.

2: Form a cross-functional team

A cross-functional team should consist of employees from the process/work area where the event will be held, as well as people from other areas of the office. Even though some team members may know little to nothing about the area, they can bring a fresh set of eyes and perspective to the table and allow for new ideas to develop. By having a cross-functional team, people who have never been in a Kaizen event can familiarize themselves with the concept.

 3: Involve people in the area

Involve operators and people in the area by notifying them that there will be an event in their designated area. The most basic communication can help prevent confusion. Also, post a flip chart in the area for employees to post ideas before an event takes place. Keep employees informed during events and follow up with operators for evaluation.

4: The 20/80 rule

During an event, 20% of your time should be spent in the classroom and 80% should be on the floor planning, designing, and doing—unless you are in a Vision event, which could require more classroom time.

5: Avoid scope creep

Stay focused on the event. Do not let bigger issues curtail you. Remember the task at hand. Homework from the event should be minimal.

6: Use PDCA (Plan, Do, Check, Act/Adjust)

Do this every day of your event.

  • P = Plan what you are going to do today.
  • D = What did we do today?
  • C = What are the results?
  • A = What are we going to do tomorrow? Adjust accordingly.

7: Follow up

Follow up for 30 days after the event. Did everyone follow through? Is everyone satisfied with the results? Is all of the homework complete?

Rick Reed is director of quality and continuous improvement at Wika Instrument CorporationRick Reed is director of quality and continuous improvement at Wika Instrument Corporation, which recently had its 300th Kaizen event; see http://bit.ly/ghSbj9. www.wika.us

About Rick Reed: Rick Reed joined Wika Instrument Corporation in July 2008 as the Director of Continuous Improvement & Quality. As Director, Reed—a certified Lean Master, Certified Six Sigma Master Black Belt, Master Trainer and Shainin Red X Journeyman—manages the implementation of the Toyota Production System using Kaizen methodology across the value stream.  Reed’s strategic initiatives for the continuous improvement of Wika ’s goals are to launch Six Sigma and project management at Wika, manage daily improvements, lower customer complaints and increase customer response time. Reed also wants to emphasize that continuous improvement involves everyone to accomplish these directives. Once these pivotal initiatives are met, customers will receive products and information in a timelier manner, increasing their confidence in Wika’s ability to meet customer demand and create customer satisfaction.

 

 

 

 



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.