IT and Engineering Insight: Seven habits of unsuccessful projects

Understanding if you are in an out-of-control IT project is important. Here are some traits of failing or soon-to-fail projects. If you have three or more of these project attributes, you need a project "reboot."

Dennis Brandl, BR&L Consulting

08/17/2010


As control engineers, we want to be well “in control.” Sometimes this is hard with a large software project. Software is difficult to view and understand during the development phase, and many projects can spin out of control without upper management even being aware of problems.

Projects can be unsuccessful for many reasons; the most common is a failure to “reboot” the project when it is heading down the wrong path. It’s hard to stop a project, even when most project members know that there are major problems and no planned solutions. For managers, it is known as the Gamble’s Dilemma: After spending $2 million on a project, it’s a difficult decision to stop it and restart, even if the final total cost will be less and actual time will be shorter. Understanding if you are in an out-of-control project is important.

-----------------------------------------------------------------------------

 

40 Under 40 – Control Engineering: Know someone working in automation under age 40 in need of some recognition? See the 40 Under 40 awards.

-----------------------------------------------------------------------------

Here are some habits common to uncontrolled projects that might help you identify if yours is one. Few failing or soon-to-fail projects will exhibit all of these traits. However, if your project has three of more, fix them before your project spins out of control. Or, consider “rebooting” the project with better controls.

1. No architect or architect team. Without a controlling influence to keep a design on track, small changes will accumulate, too often leading down dead ends or to bad decisions. If you don’t know where you are headed, then any direction seems like the right path.

2. No firm schedule. If no one knows the real schedule, or if the schedule seems to slip one week for every two calendar weeks, then the project is out of control and will never be completed on time, on budget, and with the required functionality.

3. Schedules are maintained in spreadsheets. Or, task lists are maintained in documents, and designs are in presentation files. This indicates an inability to use the right tools for the jobs—and there are many specialized project support tools that reduce the time and effort required to manage a project. Another indication of not using appropriate tools is multiple manual processes for installation, upgrades and patches; these could be automated through scripts and command files.

4. Project management has a “failure is not an option” mentality. While this is a good motto for a mission statement when your team is going to the moon, it leads to bizarre behavior in IT projects. If failure is to be punished, then people don’t report failures and management is often blissfully unaware of major problems. Similar unproductive project mottos are “right the first time” and “there are no problems, only opportunities.”

5. No configuration management or source control of documents or code. If a lot of time is lost in trying to locate needed information and confirming that it is the most current information, then better control is needed of deliverables. When team members’ best methods for sharing files and project information is through emails and USB drives, then robust configuration management processes are missing.

6. No documentation, test case, or code reviews. When a project is late and resources are stretched thin, reviews are one of the first tasks to be skipped. This is short-sighted behavior and will invariably lead to multiple problems later in the project, usually requiring extensive rework.

7. Design and test documents are not up-to-date. Until code is actually delivered the only information that is available for test development and integration design are the design documents.

If the project leadership plans on updating designs and tests after the coding is complete, then major integration and testing problems will inevitably occur.

Read more IT and Engineering Insight.

Also read: How to Avoid Project Failure.

Dennis Brandl is president of BR&L Consulting in Cary, NC, www.brlconsulting.com. His firm focuses on manufacturing IT. Contact him at dbrandl(at)brlconsulting.com.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
2013 Forecast Issue: A shift in manufacturing
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results


Poll of the Week

What category most helps you select new products?
Recommendation from colleagues
Product of the Year winners
Supplier information
Trade show visit


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.