IQS quality solution remakes automotive supply chain in U.S., then China

Bloomfield Hills, Mich.-based Cequent Group, which makes automotive towing systems, trailer parts, and associated brake and electrical components, recently rolled out an enterprise quality management system from IQS to its Chinese supplier base. Embedded in Cequent's U.S. manufacturing operations since 2002, the intention was to duplicate the system's success in establishing both a formal quali...

03/01/2008


Bloomfield Hills, Mich.-based Cequent Group , which makes automotive towing systems, trailer parts, and associated brake and electrical components, recently rolled out an enterprise quality management system from IQS to its Chinese supplier base. Embedded in Cequent's U.S. manufacturing operations since 2002, the intention was to duplicate the system's success in establishing both a formal quality management system as well as a significant reduction in defects.

Back in 2002, Cequent's manufacturing operation in Tekonsha, Mich., had been given a matter of months to



"Chinese suppliers tend to respond to the quality problems by throwing inspection labor and rework at them, rather than relying on quality management and quality processes."

—Kreg Kukor, director of global quality systems, Cequent

install a quality system that was compliant with the Ford Q1:2002 standard, recalls Kreg Kukor, Cequent's director of global quality systems. With the Tekonsha business then up for sale by its previous owners, funding was tight, and IQS' ASP-based business model was attractive, he explains.

So too was the associated speed of implementation. “We had the data loaded in two weeks, and five days later we were operational.”

Parts-per-million defect levels, then running at 4,200 per month, fell to 369 per month after just nine months, and now average 50 per month. Those same benefits were attractive in terms of Cequent's Chinese suppliers, explains Kukor.

“Not only were quality defects from our Chinese suppliers running at a thousand times our U.S. rate, but Chinese suppliers tend to respond to the quality problems by throwing inspection labor and rework at them, rather than relying on quality management and quality processes,” he says.

The U.S. deployment was rapid, with Cequent's first Chinese supplier going live on a transaction-entering basis within 24 hours. The parts-per-million monthly defect levels have fallen from 33,555 to below 300, says Kukor, and 97.5 percent of product destined for Cequent now moves through the Chinese plants without incurring rework.

“IQS made it possible for us to develop a robust quality management process for suppliers that we can quickly replicate across our entire global supply chain,” concludes Kukor. “Our suppliers appreciate the effort we put into our supplier quality management program. It improved their own performance, and secured long-term business relationships with us.”





No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.