Incomplete testing and lack of design review

This police headquarters required an overhaul of its air handlers, building automation system, and lighting system.

12/27/2013


Due to the high energy use at this all-electric police building, exp U.S. Services was brought in to perform retro-commissioning and assess the problems and potential for energy savings. This large, 12-year-old, 5-story building houses the administrative offices for the police department, which was supposedly occupied 24/7. In reality, only a small portion of the building is occupied continuously. Two large air handling units (AHUs) serve the entire building through variable air volume (VAV) and fan-powered boxes (FPBs).

During the inspection, 20 of the 100 perimeter FPBs were found inoperative. These boxes are the only source of heat, and tenant comfort issues were common. Further investigation revealed some incorrect coding in the building automation system (BAS) programming was permanently holding these boxes in “unoccupied” mode. This error was corrected quickly, and all boxes began functioning properly. Although this was not directly an energy conservation item, it allowed the building operators to shut off the AHUs during winter nights because the FPBs would operate independently, and provide heat as needed. It appears that the BAS programming for these particular boxes was overlooked during the initial start-up of the HVAC systems.

The lighting in the building is adequate, and reasonably efficient fixtures were used, but at some point during design, the wall-mounted light switches were “value-engineered” out of the building. The theory was because the building would be occupied 24/7, the lights would never be off, and the switches were superfluous. In reality, only a small portion of the building is occupied continuously and the lights are left on 24/7, wasting large amounts of energy. Area-wide lighting controllers were installed, but subsequently taken out of service due to complaints of lights going off at the wrong times or other problems.

It seems that the proper design review by the CxA would have addressed this issue, and perhaps suggested an alternative design, such as occupancy sensor light switches that would control the local lighting and avoid the current energy waste. exp’s recommendation was to install an occupancy-sensing switch for each lighting circuit in the building. Although a costly option, the annual savings are 1,440,000 kWh and $102,000 for a payback of less than 1 year. 


Terrence Malloy is project manager for the energy solutions group at exp US Services Inc. He focuses on energy conservation, retro-commissioning, and renewable energy systems.



Anonymous , 01/03/14 07:26 PM:

From my experience as a CxA on such projects, I can say with certainty that design review comments coming from a CxA are mostly ignored or forgotten by the design team. They simply don't seem to be able to evaluate and integrate well. They are in the processing mode to get out a design package.
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2015 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Your leaks start here: Take a disciplined approach with your hydraulic system; U.S. presence at Hannover Messe a rousing success
Hannover Messe 2016: Taking hold of the future - Partner Country status spotlights U.S. manufacturing; Honoring manufacturing excellence: The 2015 Product of the Year Winners
Inside IIoT: How technology, strategy can improve your operation; Dry media or web scrubber?; Six steps to design a PM program
Getting to the bottom of subsea repairs: Older pipelines need more attention, and operators need a repair strategy; OTC preview; Offshore production difficult - and crucial
Digital oilfields: Integrated HMI/SCADA systems enable smarter data acquisition; Real-world impact of simulation; Electric actuator technology prospers in production fields
Special report: U.S. natural gas; LNG transport technologies evolve to meet market demand; Understanding new methane regulations; Predictive maintenance for gas pipeline compressors
Warehouse winter comfort: The HTHV solution; Cooling with natural gas; Plastics industry booming
Managing automation upgrades, retrofits; Making technical, business sense; Ensuring network cyber security
Designing generator systems; Using online commissioning tools; Selective coordination best practices

Annual Salary Survey

Before the calendar turned, 2016 already had the makings of a pivotal year for manufacturing, and for the world.

There were the big events for the year, including the United States as Partner Country at Hannover Messe in April and the 2016 International Manufacturing Technology Show in Chicago in September. There's also the matter of the U.S. presidential elections in November, which promise to shape policy in manufacturing for years to come.

But the year started with global economic turmoil, as a slowdown in Chinese manufacturing triggered a worldwide stock hiccup that sent values plummeting. The continued plunge in world oil prices has resulted in a slowdown in exploration and, by extension, the manufacture of exploration equipment.

Read more: 2015 Salary Survey

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.
This article collection contains several articles on the vital role that compressed air plays in manufacturing plants.
This article collection contains several articles on the Industrial Internet of Things (IIoT) and how it is transforming manufacturing.
This article collection contains several articles on strategic maintenance and understanding all the parts of your plant.
click me