How and when to fold an IT project

Many manufacturing IT projects do not finish, not necessarily because they failed, but because of changing requirements, changing business conditions, company mergers, or changes in products and processes. It's important to know when to fold a project, but it is equally important to know what to do when you fold a project.

09/01/2009


Many manufacturing IT projects do not finish, not necessarily because they failed, but because of changing requirements, changing business conditions, company mergers, or changes in products and processes. It's important to know when to fold a project, but it is equally important to know what to do when you fold a project.

A manufacturing IT project contains more than just software. Any project, whether it's a PLC program, DCS program, MES system, SCADA system, HMI system, integration project, or a combination of these, will have: requirements, designs, test plans, test cases, common libraries, documentation and coding standards, and other project artifacts. The project artifacts still have value because they represent the intellectual capital invested in the project that can be captured and made available for future projects.

Typically, most project artifacts are kept only on desktop systems. At some stage in the project, these artifacts are copied to the target system or to a configuration management system. This is a risky approach because information will then be lost when the project is stopped. This is especially true if the project work is performed by contractors. As they will start looking for the next consulting opportunity once the announcement is made that the project is cancelled. Getting their attention and time to correctly document and save all of their work will be difficult, if even possible. For many projects, once the announcement is made, all outside contractors will be off the site by the end of the day.

The best rule for any project is to capture all project artifacts in common storage and, if possible, place the artifacts in a controlled configuration management system. If you are following the approach of engineers and programmers working in a local sandbox with daily check-in of work and multiple shared versions (daily build, distributed beta, final test, and final build), then you will have all of the artifacts captured.

Capturing folded project artifacts allows you to reuse those artifacts on future projects. For example, most requirements are well reviewed and agreed-to documents and these requirements may still be valid on the next project. Many of the non-functional requirements, such as performance, up-time, and security, may not significantly change from project to project.

Other examples of reusable artifacts include: error handling methods, event logging methods, standard HMI faceplates, standard control module elements (PLC or DCS code), standard interfaces, test strategies, test frameworks, test cases, and standard templates for requirements, code, and tests. Each of these artifacts may have their own requirements, design documents, and code. These documents should be added to a knowledge base and made available to future project teams.

Another important action to take when stopping a project is to generate a set of lessons learned documents. Each document should define a single aspect of the project and if it was completed above, at, or below expectations.

When something worked really well, identify the participants so they can be called in on future projects to share their knowledge. When something did not work, don't identify the participants because the goal of the documents is not to assign blame. Instead when identifying something that did not work, document why it didn't work, what the early symptoms were, and what could be tried instead.

In poker it's important to know when to hold 'em and know when to fold 'em. For manufacturing IT projects, it's also important to know how to fold 'em.

 

www.controleng.com


Author Information

Dennis Brandl is president of BR&L Consulting in Cary, NC, www.brlconsulting.com . His firm focuses on manufacturing IT. Contact Dennis at dbrandl@brlconsulting.com .




No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.