Great tool, wrong job: The hidden costs of using Excel for BOM management

Is using Excel for bill-of-material (BOM) management really free, or is using a decades-old application intended for a different purpose gambling with your business? Real-life stories provide the answer.

03/25/2009



Almost as soon as Excel superseded Multiplan, Microsoft's first spreadsheet application, in 1987, manufacturers adapted it to organize their bills of material (BOM). More than 20 years later, it’s safe to say many managers still routinely fit their product information into Excel's rows and columns.

And why not? Everyone loves Excel. It’s easy enough to use, everyone’s got it, and it came with your Microsoft Office application suite, so it's kind of free.

But is using Excel for BOM management really free, or is using a decades-old application intended for a different purpose gambling with your business? A quick read of a typical manufacturing service contract provides a hint at the answer:

“We require a complete BOM. We are not responsible for any discrepancies between your BOM, CAD, Gerbers, and assembly drawings that affect delivery schedules.”

That’s the problem with Excel. You can never be absolutely certain that the BOM you release to manufacturing is the revision you want, because Excel offers no easy way to prevent or discover discrepancies between your BOM and your drawings—or even within your BOM itself. This means that every cell in your Excel BOM is a potential source of errors since any changes to data require manual intervention—e.g., rekeying, deletion, recalculation, etc.—involving tedious inspection across all affected data.

And since every person in every department uses her or his own formulae, nomenclature, macros, and even formatting, every Excel worksheet can introduce chaos at every stage of your design-through-manufacturing process.

Crunch time
Excel, at its core, is an accounting program, not an engineering and operations management solution. Excel is designed to help you create, format, and analyze numeric data. And while it is terrific for crunching large columns of financial data, Excel is simply not designed to be a mechanism that ensures your engineering and production data are integrated, properly linked with associated records, and updated in response to changes. Automatic auditing, engineering change order and request (ECO and ECR) tracking, and collaboration facilities are not supported. Links across data—especially to external data—break easily.

Still, nothing beats Excel when it comes to manipulating numbers. But could using Excel to manage your BOMs have hidden costs, ranging from the time you spend trying to ensure the accuracy of your data, to such costly disasters as building the wrong product, missing delivery dates, exceeding cost projections, and incurring scrap and rework?

Interviews with managers of small and midsize manufacturers across industries suggest that using Excel to manage your BOMs can indeed be a costly gamble. The same managers have learned that a dedicated BOM management system is a surer bet. A modern BOM management system provides a cost-effective, time- and cost-recouping solution that overcomes the flaws and risks inherent in using a great tool like Excel for the wrong job.

Managers spoke with a surprising uniformity when reflecting on the many ways that Excel failed them as a BOM management system. Almost everyone spoke about how their Excel BOMs simply grew out of control over the years. They described their near-primal reaction whenever VLOOKUP returned the dreaded “#N/A” for a part they knew had been in their BOM for years. Cost run-ups from missed ship dates and releasing the wrong revision to manufacturing were mentioned routinely.

Managers at entrepreneurial companies were especially interested in describing the moment they realized that their small start-up was not so small anymore and they needed a better way than Excel to handle their product data. A typical story went something like this:

The Ballooning BOM
“We started out managing our BOMs with Excel. Everything was fine. We had one product with 50 or so parts. Initially, our BOM was a simple list of three columns—part number, part name, and quantity. Soon we started adding columns—manufacturer part number, supplier cost, budget cost, tolerance, and so forth. Then we got into mass customization, which meant multi-level parent BOMs that we used as a baseline to build multi-level child BOMs. We built these by copying and pasting entire columns of parent data into the child BOM and hand-editing the changes.

“Then different departments, like engineering and purchasing, wanted to manage or expand their part of the BOM. So competing formulas, ad hoc part numbers, and their jargon would slip in. Worse, with all the copies being worked on, the parts of the master BOM got out of sync. All the while the BOMs kept growing until we couldn't figure out how to pull out cost data. We'd run various VLOOKUPs matching the parent against the child and child against the parent just to find and fix every “#N/A” discrepancy. This was maddening, time-consuming, and mind-numbingly dull. Finally one day, we went through all this, gathered up all the drawings, and ended up releasing the wrong revision to our contract manufacturer, which dutifully ran a huge lot of the wrong-size parts.…$50,000 down the drain. We knew right then that Excel was the wrong tool for the job.”

Another story involves someone we'll call “Bob.”

Bob Retires
Only human resources really knew how long Bob had been at the company before his retirement party. Bob was the Excel guru. Zealously, and, frankly, to everyone's relief, he had managed the company's master BOM as his job security blanket for years. And he did it well—all 64 multi-megabyte, 2500-line BOMs with 20-25 levels of parent/child relationships, color-coding, hidden columns, annotated charts, and untold numbers of links to external workbooks.

It was on the Monday morning after Bob drove off in his RV to see America that everyone realized the keys to unlock their corporate knowledge were in the head of some guy who no longer worked for them. Teams of project managers spent weeks trying to decipher Bob's Excel BOMs. What had been a free, easy-to-use corporate asset had become a giant roadblock to growth.

And none of these kinds of problems are the fault of Excel. The tool was simply being asked to do a job it's not meant to do. Excel does not have—nor should it—the automated tools and mission-critical capabilities for BOM management.

This chart provides a quick comparison of Excel and a modern BOM management system, highlighting the strengths, weaknesses, and relative costs of each. And as you will clearly see from the chart, Excel is an excellent tool for many everyday business jobs. But when it comes to mission-critical engineering and operations management, it is the wrong tool for the job that you have to get right every time.











About the author: Helen Shaughnessy is a product marketing manager with Arena Solutions , a supplier of Software-as-a-Service (SaaS)-based product life-cycle management software.





No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.