Gas Technology: Tankless solution saves money

The solutions to reducing commercial and industrial energy bills are not always obvious, but with work and some help from your utility you can find them.

05/02/2012


Owner Works with Utility to Reduce Energy Bill

 

The solutions to reducing commercial and industrial energy bills are not always obvious, but with work and some help from your utility you can find them. An example is the steps taken at Champion Cleaners in Birmingham, Alabama. Here, a representative of Alagasco suggested the owner switch to tankless water heaters and replace a boiler. The owner now uses 25% less gas at the facility.

Looking for an Answer

Champion Cleaners operates three laundry and dry-cleaning facilities near Birmingham, Alabama. At one of the facilities, the one in Vestavia, the owner, David Whitehurst, asked for help from his gas supplier, Alagasco, to reduce his energy bill. He also wanted achieve a better supply of hot water when needed for cleaning operations.

The Alagasco representative, Clay Erwin, studied the installation looking for potential energy saving opportunities. He suggested that the owner replace an existing 100-gallon tank-type water heater with tankless units. In addition, he recommended replacement of an older boiler with a new high-efficiency vertical unit. The boiler selected was the Cleaver-Brooks Clearfire unit, with full- and part-load efficiencies up to 88%.

Consistent Hot Water

Owner Whitehurst had mentioned that one problem he had encountered was inconsistent water temperatures when conducting cleaning operations. Erwin found that the tank system was undersized for the periodic heavy hot water demands, and recommended replacement of the tank water heater with three tankless units that would supply on demand ample hot water at exactly the temperature needed. Three tankless units by Rinnai were installed on an exterior wall of the building. This also freed up indoor floor space that had been used by the tank water heater.

With the improved system, all three units are used when Champion is operating its equipment at 100% capacity. However, when demand is lower, Champion saves energy by running just the number of units needed to produce hot water for the needed cleaning process. According to Whitehurst, “The new equipment is not just using less energy for every gallon of water, but also the precise temperature control gives me a spot-free garment, which is an improvement from my old water heater.”

Results Show at the Meter

Since installation of the new equipment, gas usage has dropped about 25%, using the same volume of hot water. The new equipment also reduced carbon emissions at Champion Cleaners by 25%. Whitehurst adds, “Never did I have to change the way I operate my business to achieve more efficient results. Every part of the process was seamless — from planning to installation to follow up service.”



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
2013 Forecast Issue: A shift in manufacturing
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results


Poll of the Week

What category most helps you select new products?
Recommendation from colleagues
Product of the Year winners
Supplier information
Trade show visit


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.