Real-world Engineering BlogIn the wake of the Deepwater Horizon disaster, alarm management has moved once again into the forefront for many companies as they ask: “What is the best way to keep an operator from missing a key alarm when things start to go wrong? What are the obstacles to having an effective alarm management system?” In my experience, the decision to have, or not have, an alarm is more often cultural than it is based on a good operational analysis of the process. That’s why the alarm rationalization process is so necessary and beneficial. It strips away the cultural, “I want the operator to know about…” and replaces it with, “This is the most important thing the operator has to do.”

 

Many plant personnel do not appreciate just how significant this change is. Almost from the introduction of the DCS, its ability to generate more alarms than a human can effectively deal with was not appreciated by non-operators. Engineers and plant managers wanted the operators to know everything that was happening in their unit with the end result being just the opposite, particularly in upset situations. The DCS suppliers eventually gave us the tools to do conditional alarming which, for the most part, went unused by the typical project execution team because it wasn’t part of the scope. Process designers felt that every measurement should have the full suite of alarms and no one had the brief to question that. But things are changing.

 

ISA 18.2 outlines a methodology for developing an effective alarm management system by first requiring the plant to create an alarm philosophy document that defines the criteria for rating an alarm’s severity and urgency. The typical document classifies four levels of severity based on safety, environmental impact, or financial impact, and four levels of urgency based on how quickly the operator has to take a corrective action. A required operator response, other than to acknowledge that the alarm occurred, is a significant paradigm shift for most plants as a high percentage of current alarms are really for operator notification, often about something for which there is no corrective action. When one of the more catastrophic of those occur, all the operators can do is sit back, watch the flood of alarms resulting from the event that couldn’t be prevented in the first place, and, of course, wear out the horn acknowledge button.

 

The final solution rests with the management of the facilities, because ultimately it costs money to do the work required to implement and maintain a good alarm management system. It has to be in the culture of the facility that safety is a priority or the time and money required won’t be allocated. It also has to be in the culture that an alarm requires the operator to take a corrective action to prevent an undesirable incident.

 

Also read:

 

Managing alarms using rationalization, and

 

A rational approach to alarm rationalization

 

This post was written by Bruce Brandt. Bruce is the DeltaV technology leader at MAVERICK Technologies, a leading system integrator providing industrial automation, operational support and control systems engineering services in the manufacturing and process industries. MAVERICK delivers expertise and consulting in a wide variety of areas including industrial automation controls, distributed control systems, manufacturing execution systems, operational strategy, and business process optimization. The company provides a full range of automation and controls services – ranging from PID controller tuning and HMI programming to serving as a main automation contractor. Additionally MAVERICK offers industrial and technical staffing services, placing on-site automation, instrumentation and controls engineers. 



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Find the fake! Counterfeit electrical equipment a clear and present danger
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results


Poll of the Week

What category most helps you select new products?
Recommendation from colleagues
Product of the Year winners
Supplier information
Trade show visit


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.