Fieldbus Foundation enhances physical layer specifications

Updates to H1 physical layer specifications promote better device installation and integration.

06/02/2011


The Fieldbus Foundation has announced enhancements to its open, non-proprietary Foundation fieldbus physical layer technology. The latest updates to the H1 (31.25 kbit/s) physical layer specifications will improve the robustness of fieldbus control systems by optimizing device interoperability and integration. End users will benefit from easier installation, faster commissioning and seamless startups.

Enhancements to the Foundation fieldbus specifications include:

  • Addition of a test procedure for isolated couplers to the existing Foundation fieldbus Coupler Test Specification. Registration of isolated couplers is now possible.
  • Improvements to the H1 Physical Layer Conformance Test Specification based on Action Requests received during the last few years. The most significant changes include the addition of a receive jitter test case and a device-coupler interoperability test.
  • Updates to the H1 Physical Layer Test Specification to remove obsolete profiles and align new references in the document with the current International Electrotechnical Commission (IEC) specifications. Coupler profiles were also added to the test specification.
  • Miscellaneous updates to the Foundation fieldbus Cable Specification.

Fieldbus Foundation Director-Fieldbus Products Stephen Mitschke commented, "The Fieldbus Foundation's rigorous interoperability test and registration procedures thoroughly examine all aspects of a fieldbus device. The latest enhancements to our physical layer specifications will strengthen this testing and provide end users with greater confidence that registered Foundation fieldbus devices can be employed in a tightly integrated, interoperable control system architecture."

Implementation of the new Foundation fieldbus H1 Physical Layer Test Specification Version 2.0 is not immediately required. However, fieldbus device developers are encouraged to start using the specification as soon as possible. The updated specification will become mandatory with the next major release of the Fieldbus Foundation's Interoperability Test Kit (ITK). Until then, developers can still provide proof of conformance to Version 1.5 of the specification when registering a device.

www.fieldbus.org

Fieldbus Foundation

See more industrial network news, products, and feature articles at www.controleng.com/networks.

Also www.controleng.com/wireless.

And the Fieldbus Facts Newsletter: http://www.controleng.com/index.php?id=3108.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.