Engineering in K-12 schools: Fire and life safety

Engineers offer practical advice and best practices on how to design fire and life safety systems in K-12 schools.

03/17/2014


 Keith R. Hammelman, PE, Vice president, CannonDesign, Aurora, Ill.Robert V. Hedman, PE, LEED AP BD+C, Senior associate, Kohler Ronan LLC, Danbury, Conn.Pete Jefferson, PE, LEED AP, HBDP, Principal/vice president, M.E. Group, Overland Park, Kan.Essi Najafi, Principal, Global Engineering Solutions, Rockville, Md.Rodney V. Oathout, PE, CEM, LEED AP, Regional engineering leader/principal, DLR Group, Overland Park, Kan.Sunondo Roy, PE, LEED AP BD+C, Vice president, CCJM Engineers, Chicago, Il.

  • Keith R. Hammelman, PE, Vice president, CannonDesign, Aurora, Ill.
  • Robert V. Hedman, PE, LEED AP BD+C, Senior associate, Kohler Ronan LLC, Danbury, Conn.
  • Pete Jefferson, PE, LEED AP, HBDP, Principal/vice president, M.E. Group, Overland Park, Kan.
  • Essi Najafi, Principal, Global Engineering Solutions, Rockville, Md.
  • Rodney V. Oathout, PE, CEM, LEED AP, Regional engineering leader/principal, DLR Group, Overland Park, Kan.
  • Sunondo Roy, PE, LEED AP BD+C, Vice president, CCJM Engineers, Chicago, Il.

Global Engineering Solutions was contracted to work on the $150 million historic modernization of the Duke Ellington School of the Arts in Washington, D.C. Courtesy: Global Engineering Solutions

CSE: What unique fire suppression systems have you specified or designed in K-12 schools?

Oathout: The proliferation of technology within K-12 facilities creates a need for rooms that look more like data centers and less like closets. We have started treating the room that houses the IT equipment like a data center, including specifying gaseous and pre-action fire suppression systems.

Hedman: K-12 schools are no longer the one- or two-story, flat roof design buildings of the past. Over recent years these educational occupancies have required intricate fire protection design considerations due to ornate, “cloud” ceilings (requiring multiple levels of sprinklers). In addition, atriums and multi-story open corridors with glazing, requiring specific wall ratings, mandate the installation of listed window sprinklers. Theaters and data centers within schools are also becoming more significant, further increasing the complexity of fire protection systems. Fire standpipe systems can be required within the theaters (as well as due to the size of the overall building) and sprinkler coordination with acoustical panels, scenery, and catwalks is a must. In addition to theaters, school data/IT rooms are also being considered vital rooms, and owners are evaluating the need for pre-action and gaseous systems. Due to the overall fire protection demand, fire pumps (either electric or diesel) are also becoming more prevalent.

Najafi: For the most part the sprinkler systems that we have been required to design for our various school projects have all been the conventional automatic wet-pipe sprinkler systems. For a few of our school projects, there has been a parking garage that requires the design of conventional automatic dry-pipe sprinkler systems. On a recent project, we were asked by the client to consider a specialty system for its art storage room and display areas. The system the client asked about is a water mist system. The client believes this type of system will mitigate or lessen the potential water damage to sensitive displays and art exhibits. We are studying this approach and also considering alternative clean agent systems for this application.

CSE: How have the costs and complexity of fire protection systems changed in recent years?

Najafi: Generally speaking, the overall cost of both new installations and existing system modifications has maintained a parallel path with inflation. There have been improvements in some of the system components by manufacturers that have contributed to some savings in material costs, but the major impact to cost has been labor. The complexity of the sprinkler systems has not seen much, if any, change over the years. The basic systems design has been the same for the past 50-plus years. Installation requirements have always been modified to maintain compliance with jurisdictional authorities’ code mandates.

Hedman: As a result of the architectural detail and overall quality included within K-12 schools today, fire protection costs have increased for new schools as well as renovated educational facilities. Aesthetics, including custom paint colors and welded piping (no visible elbows/fittings) have also been desired. Fire safety is no longer simply based on code; it includes insurance carriers’ and owner’s requirements. Furthermore, the public tends to expect this higher level of safety for their children.

CSE: Describe a recent project in which a mass notification system (MNS) or emergency communication system (ECS) was specified.

Hedman: One challenge is to balance the level of security as not to interfere with the normal operations of the school day. In a recent project we provided panic buttons in all administration areas, exterior speakers for emergency notifications, and microphones for two-way communication located in secured areas. Integrating these devices within the architectural finishes provided security discretely.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.