ECS documentation 

As contractors continue to familiarize themselves with the requirements for ECS, design specifications shall consider incorporating the following NFPA 72 documentation requirements:

  • Owner’s manual
  • Record and as-built drawings
  • Written sequences of operation
  • Updated record of completion form
  • Record copy of the system specific software, where applicable
  • Copy of the site-specific software
  • Emergency response plan, with operational management procedures defined for management and activation of the system
  • Risk analysis, where applicable 

These closeout documents are vital for future modification and expansion of a system. Security of the documentation is important and should be considered as part of the design with the owner. Designers should ensure the documentation reflects the accepted system and is delivered to the owner following the system acceptance.

Design considerations

Figure 4: Notification provided within facilities as well as around buildings can use the public address system. Courtesy: Valcom Inc.Regardless of the type of fire alarm system and/or ECS being designed, the strategy should incorporate any owner/client specific requirements. As a result of the Higher Education Opportunity Act requiring (as of July 1, 2010) polices to “immediately notify the campus community upon the confirmation of a significant emergency or dangerous situation involving an immediate threat to the health or safety of students or staff occurring on the campus,” many higher education clients have incorporated emergency communications into their design standards and directives.

Specific requirements that may be incorporated into the design documents (where applicable) include:

  • Type of system to be designed
  • Capacity for future expansion (battery, conduit, number of points, wire size)
  • Fire alarm equipment allowance
  • Equipment installation height and spacing guides
  • Additional detection coverage beyond code requirements
  • Contractor qualifications
  • Conduit and wiring requirements
  • Circuiting requirements
  • Security (password protection or location of control equipment).

The design team should also consider the reliability, survivability, and level of redundancy that is to be provided by the system.

Funding restrictions 

In many applications, funding is the driving factor limiting the implementation of various ECS even when the desire and/or need for these systems is readily apparent. Funding is being reduced during each budget cycle, making schools do more with less. Many times the challenge becomes developing a long-term strategy that recommends how to incorporate ECS. Designers, engineers, and owners should understand that an ECS can include numerous technologies and equipment; however, the desired end product does not necessarily need to be implemented all at the same time. Some systems and/or parts may be implemented in phases as funding becomes available. Designers should consider the risk analysis and the most economical way of mitigating the vulnerabilities while working toward the desired end product.

So what can existing education facilities do in the short term to keep their facility, students, and parents better informed during an emergency? A quickly deployed option could be to use text messaging if the facility is able to collect and maintain an updated list of phone numbers. Additionally, the campus Internet protocol (IP) phones that are located in all of the classrooms could be programmed to broadcast a message through the speaker. Although improvements might be necessary to improve the audibility and intelligibility as well as secondary power capacity to operate during a power outage, this option may be less costly to building owners, depending on the existing infrastructure.

Other options for existing facilities may include upgrading the building fire alarm system to an in-building fire emergency voice/alarm communications system that is mass-notification ready, implementing reverse 911 calling/texting, installing high-power speaker arrays, or other ECS solutions. The cost versus benefits of the various technologies should be analyzed while taking into consideration the level of acceptable risk. 

Also, designers and owners shall consider if the educational facilities are “systems and assets, whether physical or virtual, so vital to the United States that the incapacity or destruction of such systems and assets would have a debilitating impact on security, national economic security, national public health or safety, or any combination of those matters” (based on the Critical Infrastructures Protection Act of 2001). Adding this classification could provide options for federal funding to support implementation of ECS. 



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.