EMC testing device meets IO-Link specifications

IO-Link Electromagnetic Compatibility tester from MESCO Systems is designed with test software that counts erroneous and missing telegrams during the realization of the tests.

02/04/2011


MESCO Systems introduced the new IO-Link Electromagnetic Compatibility (EMC) tester, in the MESCO’s IO-Link tool series. It is reportedly needed for EMC tests for IO-Link Master and Devices and is implemented according to the IO-Link specification. The tool is equipped with special test software and counts erroneous and missing telegrams during the realization of EMC tests. The corresponding error counters are indicated on the display screen.

The IO-Link EMC Tester consists of a handheld device where different IO-Link output stages (SDCI Interfaces) may be plugged in. Determining which output stage is needed depends on whether a device or a master shall be tested.

The IO-Link test specification defines requirements on the IO-Link physics depending on network communication rates. There are in each case two interface boxes for device tests and master tests with baud rates COM1/COM2 and COM3 available.

Operating state, error counters and baud rates are displayed via duo LED and a LCD display. It is possible to supply the IO-Link EMC Tester with battery supply which allows a galvanic isolation of the SDCI interface and a high level EMC safety. Also the external 24 V supply could be used.

www.mesco.de

MESCO Engineering

- Edited by Amanda McLeman, Control Engineering, www.controleng.com



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.