Electrical, power systems in mixed-use buildings

Engineering mixed-use buildings is a fine art—specifiers must combine multiple electrical and power systems for several business and residence types into one structure. Metering, submetering, and energy efficiency also must be considered.

09/16/2013


Robbie Chung, PE, LEED AP, Senior associate, Environmental Systems Design Inc., Chicago. Courtesy: ESDRaymond Holdener, PE, Senior associate, Dewberry, Fairfax, Va. Courtesy: DewberryAndrew Lasse, PE, LEED AP, Associate principal/senior mechanical engineer, Interface Engineering, Portland, Ore. Courtesy: Interface EngineeringGary Pomerantz, PE, LEED AP, Executive vice president, building systems, WSP, New York City. Courtesy: WSP GroupJohn Sauer, PE, LEED AP, Senior director, BSA LifeStructures, Indianapolis. Courtesy: BSA LifeStructuresLeJay Slocum, Assistant director, Atlanta regional office, Aon Fire Protection Engineering Corp., Suwanee, Ga. Courtesy: Aon Fire Protection

Participants:

Robbie Chung, PE, LEED AP, Senior associate, Environmental Systems Design Inc., Chicago

Raymond Holdener, PE, Senior associate, Dewberry, Fairfax, Va.

Andrew Lasse, PE, LEED AP, Associate principal/senior mechanical engineer, Interface Engineering, Portland, Ore.

Gary Pomerantz, PE, LEED AP, Executive vice president, building systems, WSP, New York City

John Sauer, PE, LEED AP, Senior director, BSA LifeStructures, Indianapolis

LeJay Slocum, Assistant director, Atlanta regional office, Aon Fire Protection Engineering Corp., Suwanee, Ga.

 


CSE: What’s the one issue most commonly overlooked in electrical/power systems on mixed-use projects?

For The Avenue, a mixed-use development in Washington, D.C., Dewberry provided mechanical, electrical, and plumbing engineering for the 10-story 460,000-sq-ft office building, as well as a 450,000-sq-ft parking structure and central courtyard at 2200 PennHoldener: Mixed-use facilities present a number of unique challenges for the electrical/power designer. It is typical for a mixed-use facility to house multiple entities such as rental unit tenants, condominium unit owners, retail tenants, commercial office tenants, and others. These entities have very different electrical power requirements that must be considered not only individually but collectively as the electrical service entrances, generator systems, electrical distribution systems, and life safety systems are being designed. 

One issue that is commonly overlooked when designing the electrical system for a mixed-use facility is coordinating with building ownership to determine the appropriate segmentation of the electrical distribution equipment and then making sure that all of that entity’s equipment is powered from its particular segment. For example, if a facility houses both rental units and condominiums, with the rental units on floors 1 through 5 and condominium units on floors 6 through 10, then it is sometimes desired by building ownership to serve the common systems of floors 1 through 5 such as lighting, general purpose receptacles, elevators, and other similar systems from electrical panels served via the rental portion of the project with the condominium floors being designed similarly. However, this arrangement is not always the case because other facilities implement extensive submetering systems to segment the power usage. Close coordination with building ownership needs to be performed as early as possible in the design process.

CSE: How have energy efficiency and sustainability requirements affected your approach to tackling electrical systems in mixed-use buildings?

Holdener: Mixed-use facilities typically present excellent opportunities for energy savings, particularly because of the constantly operating MEP systems that serve dwelling units and common areas such as lobbies, corridors, and amenity spaces. Unlike commercial office buildings where a significant portion of the building’s systems ramp down due to low occupancy as evening approaches, it is often the case that a mixed-use facility’s occupant load increases as the workday ends. Therefore, selecting energy-efficient light fixtures, implementation of lighting control systems, implementation of energy-efficient appliances, and other strategies are of paramount importance in providing the building owner with an energy-efficient and sustainable building. 

CSE: Describe a recent submetering project in a mixed-use building. What were the challenges and solutions?

Holdener: A recent project included over 350 dwelling units comprising both rental and condominium types. The project also included retail tenant spaces, common areas accessible by both rental tenants and condominium owners, and a common underground parking garage. The design included electrical utility meters for the dwelling units and electrical submeters for the common area and house loads. After coordination with building ownership, it was determined that the common area loads were required to be broken down into six categories. This provided multiple challenges, including but not limited to determining the various options for segmenting the electrical distribution system, coordinating physical space for the various meters, data management, and other logistical issues. After extensive research and review, the final design implemented a submetering scheme that consisted of color-coded submeters housed within multiple meter cabinets located throughout the project. Each of the six categories of load types was assigned a color code to aid in the management of the submetering system. Data from the meters is collected via the project’s energy management and control system.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.