Efficient case packer
The 939EZ Versatron Case Packer can operate up to 30 cases per minute and features rugged and durable change parts for easy and consistent changeover.
The 939EZ Versatron Case Packer is equipped with an air-over-oil lift table, which controls the descent of product into the case, and a simple indexing case feed which maintains design simplicity without sacrificing control and speed. The 939EZ can operate at speeds of up to 30 cases per minute. It is also equipped with a variety of rugged and durable case packer change parts, all designed for safe, easy, and consistent 15-minute changeover. Optional equipment and features include a pneumatically controlled flap opener for RSC cases and a PanelView 1000+ graphically driven human machine interface (HMI).
Standard-Knapp
Case Study Database
Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.
These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.
Click here to visit the Case Study Database and upload your case study.
2012 Salary Survey
In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.
Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.












