Educational experience: Codes, standards in K-12 schools

Engineering work on K-12 schools is complex—and not just because of dwindling school budgets. The facilities must meet a broad range of exacting standards coming from officials and state regulatory bodies, in addition to meeting energy efficiency standards. An overview of codes and standards follows.

03/27/2013


 

Robert J. Linder, PE, LEED AP, Senior Project Manager, Karges-Faulconbridge Inc., St. Paul, Minn.Robert N. Roop, CPD, LEED AP, Principal, Peter Basso Associates, Inc., Troy, Mich.Abbas Shirian, PE, CGD, LEED AP, Principal-in-Charge, Lead Mechanical Engineer, Bridgers & Paxton Consulting Engineers, Albuquerque, N.M.

Participants


 

CSE: What codes, standards, or guidelines do you use as a guide as you work on these facilities?

Roop: Our designs comply with or exceed all state and local codes as well as other recognized standards of care set forth in publications by organizations such as ASHRAE, American Society of Plumbing Engineers, and NFPA. We also apply judgment to some minimum requirements or performance standards in these guidelines and, at times, use values in excess of the minimum values to increase occupant comfort or system performance.

Shirian: For energy efficiency projects we use ASHRAE Standards 90.1, 62.1, and 55. We are beginning to use ASHRAE Standard 189 for high-performance projects and Advanced Energy Design Guides for specialty building types. Labs21 also offers excellent guidance for various system types when designing lab buildings. The American Institute of Architects’ new energy modeling guide is a guide we are recommending to our architectural clients, and we commend the USGBC for creating a guide for energy modeling. We continually reference the International Building Performance Simulation Association’s (IBPSA) BEMbook for energy modeling.

CSE: How have Energy Star, ASHRAE, U.S. Green Building Council, or other guides affected your work on K-12 schools? What are some positive/negative aspects of these guides?

Shirian: For K-12 schools, LEED and USGBC have been influential in creating a framework for integrated low-energy design, and ASHRAE has allowed for a means to standardize a process for evaluating and designing associated systems. While these organizations seem to complement one another, various LEED credits potentially introduce energy-efficiency penalties as part of the LEED rating system. For instance, obtaining credit for increased ventilation introduces additional HVAC load on to a building, potentially increasing annual energy expenditures. And while ASHRAE Standard 90.1 includes excellent metrics for evaluating building performance, larger buildings using traditional variable air volume (VAV) systems typically incur additional HVAC costs in order to exceed energy performance of a baseline VAV system. Energy Star is becoming a more influential standard in building design and construction, offering a benchmark for certification based on actual energy use in lieu of predicted, like the new construction LEED rating systems require. All schools funded by the state of New Mexico shall be designed in compliance with State Energy Efficiency Standards for Public Buildings and shall be qualified for the Environmental Protection Agency’s (EPA) Energy Star.

Linder: These programs have done a great job of highlighting the value of quality engineering practices. However, the costs associated with certification have a large impact on project budgets. We are finding that school districts are still designing and constructing to the sustainable program standards but are moving away from formal submittal for certification.

Roop: The increased awareness of energy conservations programs and high-performance building designs by K-12 school districts and boards has made these items priorities in our designs. We have seen these initiatives embraced by the K-12 school market faster than by other market sectors because their primary funding source is through public dollars. In an effort to demonstrate their good stewardship of the trust of the public, districts often push to be as energy conscious as possible. To that end, we have worked with several local districts to gain Energy Star rating for all district facilities. We have also been the engineer of record for three comprehensive high school buildings which have received LEED Silver. 

CSE: Which code/standard proves to be most challenging in such facilities?

Roop: Early versions of LEED were more difficult to apply to K-12 buildings than other building types in some respects due to the use and function types, which vary widely between buildings. Later revisions of the standard have included more building-specific type criteria, which are more applicable to K-12 building types and functions.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.
Electric motor power measurement and analysis: Understand the basics to drive greater efficiency; Selecting the right control chart; Linear position sensors gain acceptance
Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.