SEARCH Archives
Loading
Sponsored by:

EC: WM30 Smart Power Quality and Utility Analyzer

Power - monitoring, protection – Carlo Gavazzi Inc. - WM30 Smart Power Quality and Utility Analyzer is an innovative, three-phase power analyzer offering an upgraded LCD display, capable of showing four electrical variables, an energy counter and a power demand indicator at the same time. This is a Control Engineering 2011 Engineers' Choice (EC) nominee.

11/01/2010


WM30 Smart Power Quality and Utility Analyzer - Carlo GavazziThe WM30 Series Smart Power and Utility Analyzer is an innovative, three-phase power analyzer offering an upgraded LCD display, capable of showing four electrical variables, an energy counter and a power demand indicator at the same time. The WM30 Series features innovative touch pad programming, which prolongs product life vs. the antiquated tactile push buttons used in Carlo Gavazzi's older products and by most other energy management/metering products available on the market.       

The analyzer's modular sandwich style design provides up to 70% more behind panel depth, as the user simply snaps additional features to the back of the meter, by stacking and securing optional output/communication module(s).

The WM30 Series also offers four communication options:  RS485, RS232, Ethernet and BACnet-IP, as well as the basic relay, transistor and analog outputs. The WM30's BACnet-IP communications is them most widely used protocol in the Building Automation and Control System market, which is an ASHRAE, ANSI and ISO standard protocol.

The WM30-96 is particularly recommended for utility metering, for both imported and exported energy, and  provides accurate electrical parameter measurements with 0.2% accuracy (current/voltage) and basic power quality analysis, up to the 32nd harmonic. Additionally, the analyzer can be provided with digital outputs that can be utilized for pulse (proportional to the active or reactive energy) and/or alarm outputs.    

www.GavazziOnline.com

www.gavazzionline.com/pdf/WM3096brochure.pdf      

Carlo Gavazzi Inc.            

For more, see www.controleng.com/awards.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Find the fake! Counterfeit electrical equipment a clear and present danger
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results


Poll of the Week

What category most helps you select new products?
Recommendation from colleagues
Product of the Year winners
Supplier information
Trade show visit


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.