EC: CoDeSys Embedded Controller CPX-CEC
Machine and Embedded Control - PLCs: Festo Corporation, CoDeSys Embedded Controller CPX-CEC. The CPX-CEC embedded controller from Festo Corporation is an intelligent remote I/O terminal with direct machine mounting that facilitates integration of pneumatics, electric drives, and I/O on the same compact controller with up to 31 electric drives and up to 512 I/O. This is a Control Engineering 2011 Engineers' Choice (EC) Honorable Mention.
The CPX-CEC embedded controller from Festo Corporation is an intelligent remote I/O terminal with direct machine mounting that facilitates integration of pneumatics, electric drives, and I/O on the same compact controller, up to 31 electric drives and up to 512 I/O. Its CAN-Master functionality delivers flexibility, open-and closed-loop standalone control for economical automation or remote control with pre-processing. The CPX-CEC offers fast cycle times of 1ms. The comprehensive CoDeSys function library takes care of diagnostics and condition monitoring options. These units meet both IEC 61131-3 programming standards and IP65/IP67 enclosure protection standards.
CPX-CEC Functions:
- PLC control for valve terminal configurations with MPA, VTSA
- Connection to all most industry fieldbus standards as an intelligent slave to provide local processing
- PLC with CANopen master as standard for activation of electric drives or most 3rd party CANopen device
- Diagnostics with flexible monitoring possibilities for pressure, flow rate, cylinder run time, air consumption, early warnings and visualization options
- Activation of decentralized installation systems on the basis of CPI
- Activation of applications of proportional pneumatics
- Servo-pneumatic applications AS-interface control via Gateway
- CoDeSys ensures simple commissioning, fast programming, and parameterization.
www.festo.com/cms/en-us_us/12886.htm
Festo Corporation
For more, see www.controleng.com/awards.
Case Study Database
Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.
These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.
Click here to visit the Case Study Database and upload your case study.
2012 Salary Survey
In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.
Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.












