Drive solution designer harnesses energy, cost savings

Lenze’s drive solution designer has optimized sustainability for material handling industry.

SOURCE: Lenze America

03/29/2011


LenzeLenze Drive Solution Designer Example Americas has launched a Drive Solution Designer (DSD) for the material handling industry. A software tool for design engineers, the Lenze DSD analyzes the complete drive train of an application to ensure the correct design and dimensioning of a decentralized system.

“With the long running times in material handling applications, energy use is one of the major cost factors – and one of the first places we look to reduce costs,” said Craig Dahlquist, Lenze Product Manager.

The Lenze DSD software is a comprehensive examination aimed at deriving real energy savings through the use of highly efficient motors and transmissions; achieving precisely matched speed control through the use of frequency inverters; and enabling the utilization of regenerative energy produced during motor braking.

“The intelligent and economical use of the energy in each component of the drive train translates into a reduction in total energy consumption and a swifter return on investment,” adds Dahlquist.

The energy requirements of a drive train and the individual components are calculated along with the amount of regenerative energy that can be exchanged via the DC bus or fed via a regenerative module to the supply system. Lenze DSD optimizes the energy use of each component by determining the loss/load ratio of the mechanical processes. Since drive train components work at low efficiency in partial load applications, contributing to high energy loss, the DSD works to accurately specify the precise load-dependent power requirements of the machine, in order to maximize energy savings.

Backed by extensive application libraries and process-specific calculations, the DSD guides users step-by-step through product options and benefits, offering in depth comparisons of multiple drive solutions.

www.lenzeamericas.com

Lenze Americas

- Edited by Gust Gianos, Control Engineering, www.controleng.com



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Find the fake! Counterfeit electrical equipment a clear and present danger
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results


Poll of the Week

What category most helps you select new products?
Recommendation from colleagues
Product of the Year winners
Supplier information
Trade show visit


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.