Drexel University Chestnut Street Housing

New construction: Drexel University Chestnut Street Housing, Bala Consulting Engineers Inc.

08/09/2012


A view of new student housing development is from Chestnut Street. Courtesy: Bala Consulting Engineers Inc. (Click to enlarge) Project name: Drexel University Chestnut Street Housing

Location: Philadelphia, Pa.

Firm name: Bala Consulting Engineers Inc.

Project type, building type: New construction, school (college, university)

Project duration: 2 years

Project completion date: Sept. 1, 2013

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $21 million

Engineering challenges

The three new residence halls will wrap two sides of a city block and are being constructed between the public sidewalks and existing university buildings. Prior to beginning construction of the new buildings, steam, electric, telephone, and cable utilities serving the existing buildings had to be relocated into corridors between the residence halls. Mechanical and electrical spaces within the existing buildings were no longer located in perimeter spaces, and new This is a view of Mandell courtyard on Chestnut Street. Courtesy: Bala Consulting Engineers Inc. (Click to enlarge)ventilation and cooling pathways were identified through both the existing and new buildings. Separate mechanical systems were required for the apartment tower and the townhome units. The stacking nature of the apartments was ideal for vertical stack water source heat pumps; one heat pump is provided in each apartment with limited ductwork in each living space. The townhomes alternate living rooms and bedrooms and interior walls do not align; Variable refrigerant flow (VRF) systems with individual fan coils are utilized. In all cases, the ability to simultaneously heat and cool different living units or interior spaces is maintained.

Solutions

All three buildings are served from the same central utilities. High-voltage electrical service, natural gas, domestic water, domestic hot water, and the circulating heat pump loop are all extended from building to building through common spaces and crossing below grade in the areas between buildings. Appropriate access to all utilities was maintained.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.