Do primary windings of liquid-filled transformers fail?

The short answer is no, primary windings of liquid-filled transformers don't fail. Here's why.

05/17/2012


VPI failure at ends of windings, and flashover to ground.In the same 35-year period of time, I’m counting up the number of failures of primary windings of liquid-filled transformers I’ve experienced, or have been reported to me, or that I’ve heard about or read about, caused by vacuum breaker switching in data centers. It’s exactly NONE.

In that same period of time, I’ve commissioned well over 500 liquid-filled transformers installed indoors and outdoors at large data centers, and have experienced zero primary winding failures, despite hundreds of deliberate switching operations of upstream vacuum breakers during commissioning and later plant operations, under all possible conditions of system loading and connection configurations in various primary loop arrangements. Nearly half of these had 34.5 kV primaries, as nasty and tough and ugly a utility distribution voltage as there is on the planet (more to come about system voltages and their relationship to the problem).

Again, I’m only relating my personal experiences and observations and opinions here. If anyone knows of failures of primary windings in liquid transformers installed in data centers caused by this phenomenon, I would like very much to learn about them.

Some Explanations for the Differences 

 

Clients ask me, “if you believe all of this so strongly, what logical reasons are there to explain these differences?”  Here are some of the reasons:

  • Of the 30 or more failures of dry-types I’ve personally investigated, approximately 20% of those were failures deep within the windings, suggesting oscillatory transients at the resonant frequency of the transformer, most likely caused by re-strike ignition phenomena during breaker opening at light transformer loading. (All of those failures coincidentally had secondary loads of 6 or 12 pulse input rectifiers in the front ends of static UPS systems).
  • But, the large majority of the failures I investigated occurred at the ENDS of the primary windings, or at delta corner jumper leads, or at tap connections, and often flashed over to the grounded steel enclosure or to grounded core steel. I’ve come to believe that a major part of the problem was the connections to these live parts were insulated only by air, and that arrangement provided an all-too-easy flashover path on seeing a sudden big blast of L(di/dt) come shooting out the ends of the windings.
  • Moreover, these failures occurred in areas where winding insulation was changing from paper to air-only, and where the line impedance was also chancing. Had all these connections been instead immersed under a high dielectric strength insulating fluid, I believe that many of these failures would not have occurred.
  • In other words, I think that a number of these failures might not have actually been WINDING failures. They were more likely terminal connection failures due to the inadequate dielectric strength of the surrounding air, and the actual winding damage that did occur might have been mostly just collateral damage. (Interestingly, the majority of these did not even have surge arresters of any type connected to the winding terminals). More discussion about this coming next week.


No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.