Designing office space: Sustainability and energy efficiency

Office building clients demand sustainability, flexibility, and cost conservation in both new and existing buildings.

10/22/2012


Michael F. Cooper, PE, LEED AP, is a Managing Principal at Harley Ellis Devereaux in Southfield, Mich. Courtesy: Harvey Ellis DevereauxKurt Karnatz, PE, CEM, LEED AP, HBDP, HFDP, is the President of Environmental Systems Design Inc. (ESD) in Chicago. Courtesy: ESDKent W. Peterson, PE, FASHRAE, LEED AP BD+C, BEAP is the Vice President/Chief Engineer of P2S Engineering Inc. in Long Beach, Calif. Courtesy: P2S Engineering

Respondents

Michael F. Cooper, PE, LEED AP, Managing Principal, Harley Ellis Devereaux, Southfield, Mich.

Kurt Karnatz, PE, CEM, LEED AP, HBDP, HFDP, President, Environmental Systems Design Inc., Chicago

Kent W. Peterson, PE, FASHRAE, LEED AP BD+C, BEAP, Vice President/Chief Engineer, P2S Engineering Inc., Long Beach, Calif.


 CSE: What software or systems do you use to model the energy consumption of the building? 

Cooper: Initial predictive energy modeling is usually done with either the Trane Trace or Energy Pro software packages. We also utilize elements of the Green Builder software bundle to help conceptualize system requirements and performance in the early stages of design. 

Peterson: Energy modeling is a powerful design tool to review the relative energy savings of various energy-saving features. We use a number of software platforms since one may be better than the others for a given project utilizing certain systems. I still believe the current state of energy modeling software is insufficient to predict actual energy use of a building but is adequate for comparing options to each other. We must also realize the energy models for building energy code compliance (Standard 90.1 or Title 24) prescribe the occupancy loading and building operating times to determine compliance with the energy codes. The results will not reflect how much energy the building will actually use. 

Karnatz: We use multiple modeling engines to help us determine the performance and energy consumption of buildings including eQuest, COMcheck, HAPP, Trace, Window, Ecotect, Therm, Flo-Vent, and Vasari. 

CSE: In general, what payback period do building owners expect from an office building? 

Karnatz: Typically our office building owners are looking for quick payback windows in the range of three to seven years. 

Peterson: In our experience, office building owners are typically looking for three-year paybacks. 

Cooper: Though expected payback varies based on the type of building owner (developer, owner, owner/tenant, etc.), “as soon as possible” remains the common denominator. In general, we see expectations on the order of five to seven years, but design buildings to achieve the most aggressive payback possible. It is important that such economic modeling is done early in the design process so that financial objectives are in alignment with the technical goals of the project. 

CSE: Describe window treatments (glazing, louvers, etc.) you have recently designed. 

Karnatz: When designing regionally, it is important to look at opportunities that the site provides to the building. Controlling direct sunlight on and into the building is important in minimizing building envelope loads while maximizing daylight capture. We use both passive and active shading strategies such as high-efficiency glass systems, exterior shading, interior mechanized shades, and light shelves. 

Cooper: Window treatments, like most building elements, are features that are integral to the building design as a whole. We utilize glazing, window surface texture, louvers, light shelves, solar film, and other materials as part of comprehensive building solutions. 

CSE: Describe any energy modeling you’ve used to design new office space. What programs did you use? What were the results?

Cooper: As stated, Trane Trace and Energy Pro regularly are used for modeling of new office space. Comparative evaluations of proposed building solutions are made with not only HVAC systems, but lighting and envelope as well. Results are good and getting better. As energy modeling software, building information modeling, building materials, and construction techniques are improving, our ability to more accurately predict energy consumption in new buildings is also improving.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.