Designing office space: Electrical, power systems

Office building clients demand sustainability, flexibility, and cost conservation in both new and existing buildings.

10/22/2012


Michael F. Cooper, PE, LEED AP, is a Managing Principal at Harley Ellis Devereaux in Southfield, Mich. Courtesy: Harvey Ellis DevereauxKurt Karnatz, PE, CEM, LEED AP, HBDP, HFDP, is the President of Environmental Systems Design Inc. (ESD) in Chicago. Courtesy: ESDKent W. Peterson, PE, FASHRAE, LEED AP BD+C, BEAP is the Vice President/Chief Engineer of P2S Engineering Inc. in Long Beach, Calif. Courtesy: P2S Engineering

Respondents

Michael F. Cooper, PE, LEED AP, Managing Principal, Harley Ellis Devereaux, Southfield, Mich.

Kurt Karnatz, PE, CEM, LEED AP, HBDP, HFDP, President, Environmental Systems Design Inc., Chicago

Kent W. Peterson, PE, FASHRAE, LEED AP BD+C, BEAP, Vice President/Chief Engineer, P2S Engineering Inc., Long Beach, Calif. 


CSE: What’s the one factor most commonly overlooked in electrical systems? 

Cooper: The most overlooked element in electrical systems is planning for the future. We know that once these systems are installed, it’s costly and disruptive to modify or expand them. We also know that changing tenant needs are driving the need for system adaptability. Information technology alone has driven significant changes in electrical systems design. It’s critical that time is taken at the start of each project to assess the needs of today and tomorrow and how today’s systems can help facilitate future growth. 

Karnatz: Power quality. While the total power required on a W/sq ft basis is trending down for office occupancy, the need for power quality and reliability is not. 

CSE: Describe a recent project in which you had complex metering and submetering in a building. 

Karnatz: As previously mentioned, large office buildings with multiple and diverse occupancy needs very often require complex metering schemes. In buildings where there is a great diversity in tenancy and therefore infrastructure consumption, the need to accurately allocate use costs is very important. Very often buildings have some tenants that might consume three to five times the amount of power and cooling that others consume. 

Cooper: One recent project, which achieved a U.S. Green Building Council LEED Platinum Certification, included a building distribution system segregated by load type as well as metering at each tier of the system to for real-time monitoring and management. “Dashboard” displays throughout the facility indicate real-time usage and trending of all utility services. There is truth in the statement, “what gets measured, gets managed.” 

CSE: How do you balance the need for reliable power with the desire for efficiency and sustainability? 

Karnatz: We believe that efficiency, sustainability, and reliability is the three-legged stool of power delivery in an office environment. Depending on tenant enterprise needs, the weighting of the importance of these three elements will vary. 

Cooper: Step one is to understand the level of reliability required by the owner. A computer facility may, for example, have a different need than a general office environment. Once understood, we can then properly evaluate and design power system selective coordination such that impact to system efficiency or sustainability is minimized. The goal is to provide what’s needed in the most efficient way possible. 

CSE: What type of backup or standby power systems have you specified into an office building recently? 

Cooper: Most recently, we have installed parallel natural gas generators (N+1) with rotary UPS systems for critical electrical loads. As our reliance on information technology, Web-based communications, and data management continues to increase, the focus on robust electrical systems and reliable backup provisions will likewise increase. 

Karnatz: We commonly provide backup and standby power through the use of multiple utility feeds, supplementary power generation, and UPS systems. 



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.
Electric motor power measurement and analysis: Understand the basics to drive greater efficiency; Selecting the right control chart; Linear position sensors gain acceptance
Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.