Desiccant dehumidification for surgical rooms

Some surgical rooms can tolerate no more than +/- 2% change in relative humidity; desiccant dehumidifiers can be used as standalone solutions.

03/24/2011


A newly constructed medical facility planned to offer patients corneal refractive (Lasik) surgery by reshaping the cornea with state-of-the-art equipment. But shortly after the facility was completed, surgical procedures were suspended abruptly. The existing HVAC system serving the surgical procedure room couldn’t deliver the required temperature and humidity necessary for optimal surgical outcomes.

Studies have shown that successful refractive surgeries demand exacting environments. That means no more than a +/- 1 F swing in temperature and a +/- 2% change in relative humidity (rh) over a 10-min period. It was a non-negotiable issue for surgeons who monitor digital readings of room temperature and humidity during every procedure. If the room doesn’t hold conditions, surgery cannot be performed.  As a result, the new surgical suite was temporarily unusable, and surgical procedures had to be performed offsite.

“Everyone was, to say the least, very disappointed,” the medical center’s facility manager said. “This was meant to be a showcase piece among surrounding hospitals.”

Obviously, the priority was to get the surgical facility up and running as soon as possible. Kroeschell Inc., a Chicago-based mechanical engineering firm, was chosen to evaluate and make recommendations to correct the problem.

According to Steve Cooper of Kroeschell, an investigation found that the existing chilled-water coil temperature did not allow for the discharge air temperature to be any lower than 50 F. This would not allow the space to be much below 50% rh, which was unacceptable because the required optimal conditions are 68 to 72 F and 40 to 45% rh.  There was an existing supplemental fan coil installed above the ceiling in the room, but even this unit could not effectively lower the relative humidity to acceptable levels.

“It was determined that mechanical dehumidification was needed to achieve the temperature and humidity criteria requested,” Cooper said. “The original equipment did not include dehumidification. In addition, highly accurate sensing instruments had to be included in the design.”

Stand-alone dehumidification

Kroeschell recommended a Munters HCD Series desiccant dehumidifier as a standalone solution to the problem. This unit incorporates Munters’ HoneyCombe wheel that is capable of collecting and releasing water six times every hour, 24/7. In addition to the desiccant wheel, the unit includes filtration, a supply fan, and a reactivation heater and discharge fan for wheel.

Fresh outdoor air comes into the dehumidification unit, which is controlled to maintain 43% rh discharge air humidity, and then enters the air handling unit serving the room. Room temperature and humidity sensors control the chilled-water coil valve, the electric duct heater, and the humidifier to maintain the design parameters. Air temperature and humidity sensors for air leaving the unit are incorporated into the programming logic of the existing direct digital control (DDC) system.

Though not ideal, the original air handler above the ceiling was kept in place because its removal would create dust in the surgical room, thereby causing problems with sensitive laser equipment in the room. Constant volume (CV) boxes were added to ensure a positive pressure in the room.

Achieving accuracy

The project was a success, with surgical procedures commencing immediately and continuing on schedule without interruption. Medical personnel report the system is maintaining humidity with a deviation of only +/- 0.6% rh, a tolerance they believe is virtually unprecedented in other Lasik surgery facilities in the country.

“We’re very proud of the outcome of this high-profile project,” Cooper said. “The Munters dehumidifier provided a straightforward, affordable solution for a facility with extraordinary requirements. This tells us the product has application possibilities wherever original chilled water design misses the mark in terms of latent load.”



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.