Data center design: Automation and controls

In the information age, data centers are one of the most critical components of a facility. If the data center isn’t reliable, business can’t be done. Automation and controls play a key role.

01/27/2014


Kevin V. Dickens, PE, LEED BD+C, Mission critical design principal, Jacobs Engineering, St. Louis. Courtesy: Jacobs Engineering Terrence J. Gillick, President, Primary Integration Solutions Inc., Charlotte, N.C. Courtesy: Primary Integration SolutionsBill Kosik, PE, CEM, BEMP, LEED AP BD+C , Principal data center energy technologist, HP Technology Services, Chicago. Courtesy: HP Technology ServicesKeith Lane, PE, RCDD, NTS, RTPM, LC, LEED AP BD+C, President/CEO, Lane Coburn & Associates LLC, Bothell, Wash. Courtesy: Lane Coburn & AssociatesDavid E. Wesemann, PE, LEED AP, ATD, President, Spectrum Engineers Inc., Salt Lake City. Courtesy: Spectrum Engineers Inc.

Respondents


CSE: What factors do you need to take into account when designing automation and controls for a data center? 

Work at the 164,000-sq-ft Nu Skin Innovation Center in Provo, Utah, commissioning project included a complex data center. Courtesy: Spectrum EngineersWesemann: The ability to seamlessly integrate all mechanical and electrical controls, monitoring, and metering into a single platform, and one that has informative and user-friendly dashboards, charts, and graphics.

Dickens: The greatest factor in the modern data center is figuring out how to match infrastructure supply to IT demand in real time. This falls under the umbrella of what is euphemistically called data center infrastructure management (DCIM), but the definition of what exactly is needed under that umbrella is as varied as the number of vendors hawking it. The technology is there on both sides (IT and facilities), but bridging the gap and using the information intuitively is still in the defining stages. When designing today, one has to work to advance the science of DCIM without introducing undue risk.

CSE: According to a recent poll conducted by Consulting-Specifying Engineer, the automation and controls within a mission critical facility were the most complex issue. Do you agree? Why or why not? 

Gillick: I agree. The automation systems can vary from simple to extremely complex depending on the Tier rating or the criticality of the structure, be it a hospital or a data center. When owners were using direct expansion cooling systems and other types of non-central plant cooling systems, the associated direct digital control (DDC) systems were relatively straightforward and quite suitable for those cooling systems. With the increasing deployment of large mechanical chilled water plants in data centers over the past five years, there has been a big push to use very complex, robust programmable logic controllers (PLCs) in these central plants. Additionally, we are finding facilities with hybrid control systems comprising both DDC and PLC controls systems within the facility, incorporating an integrated and seamless system front end. DDC systems are typically deployed within administrative and other non-critical areas, PLCs to run the central utility plant, and supervisory control and data acquisition (SCADA) systems, power monitoring systems, and branch circuit monitoring electrical power at the equipment rack. In these facilities, we have to validate that these systems are communicating with each other. Moreover, there is a significant cost differential between DDC and PLC systems; therefore, a first-cost versus equipment lifecycle cost analysis must be done prior to adopting a controls strategy.

Dickens: Agree. To optimize the energy use of a data center, you need to be able to respond to varying loads. In legacy data centers the relationship between what the server is drawing and the amount of heat being rejected from the HVAC system is two to three times removed. The solution is obvious—you need to sync demand and response. And while ASHRAE has moved us in the right direction by encouraging the relocation of the temperature sensors from the CRAC return air inlet to the IT servers inlet, we are still reacting to a symptom (an increase in space temperature), not the source of the problem.

Wesemann: I agree with this because many automation and controls systems are designed for either good mechanical controls, or good electrical monitoring and controls, but not both. They do one or the other very well, then rely on custom interfaces and programming to get the other. It is difficult to find systems, vendors, and installers who do both mechanical and electrical monitoring and controls very well.



Michael , United States, 02/04/14 04:18 PM:

What are your specs for the temp and humidity requirements. We are a mfr of sensors and this is great info.

Mike
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.