Data acquisition: get it right

Data acquisition quality relies upon how closely the representation of reality matches what’s being measured. Drivers who are high insurance risks may explain that the only measurement that matters is the instant when a police radar gun measures their speed. Reality, however, may differ significantly depending on the point of measurement and how variable their driving process.

08/01/2008


Data acquisition quality relies upon how closely the representation of reality matches what’s being measured. Drivers who are high insurance risks may explain that the only measurement that matters is the instant when a police radar gun measures their speed. Reality, however, may differ significantly depending on the point of measurement and how variable their driving process.

A sampling rate that’s too infrequent (see graphic) may not represent the process accurately enough for sound decision-making. Elliott Middleton, Wonderware Historian product manager, says many processes can change significantly between sample times. For a more accurate representation [of automobile speed], “You’d probably need to sample every 5 seconds or so. However, if we were, instead, recording your speed on I-10 traveling from Palm Dessert to Blythe, sampling every 2 minutes might be adequate—the difference is the variability in the data and the level of accuracy (and number of samples) you need.”

According to Brian Betts, group manager for data acquisition marketing at National Instruments, the five elements of a basic data acquisition (DAQ) system are transducers and sensors; signals; signal conditioning; DAQ hardware; and driver and application software.

DAQ can be do-it-yourself, rely on purchased or integrated systems, or be contracted through a laboratory or service. Rockwell Automation, for instance, is among vendors with a testing and certification lab that performs DAQ testing and documents results. Rockwell Automation says that type of high end system, calibrated by standards traceable to National Institute of Standards and Technology (NIST), also has been inspected and approved by UL and CSA for test requirements.

If the graph measured a car

If the graph measured a car's speed on surface streets every two minutes, an inaccurate representation would result, no matter how good the sensors, network, and software delivering the analysis.

Measure the right thing

While chapters and books provide DAQ advice, doing it right involves ensuring 1) that what’s being measured represents the process, 2) signal integrity, and 3) accurate analysis.

Most common DAQ errors, according to John Lehman, engineering manager, Dataforth Corp., are capacitive coupling, magnetic coupling, ground loops, over-voltage and transients, electromagnetic interference/radio frequency interference (EMI/RFI); and aliasing. Sources of signal interference vary.

“In today’s dynamic industrial environments,” Lehman says, “signal and power wiring, electronic devices, and other electrical plant/process equipment often interact to create noise that can degrade critical measurement and control signals.”

Signal conditioning technologies can help. When signals are too faint or dangerous to measure directly, signal conditioning can amplify, attenuate, isolate, excite the sensor, multiplex the signal, and offer other functions, such as bridge completion and simultaneous sampling, says Betts of NI.

After (or as) information is acquired, various software programs can analyze and keep records, often for regulatory purposes, adds Keith Jones, Wonderware marketing program manager for HMI, supervisory, SCADA and platforms. How much and how fast? Systems vary in bandwidth and speed by need.

Recent DAQ software from Yokogowa, for instance, records from as many as 32 recorders, data loggers, controllers, measuring instruments, or other devices, enabling acquisition of data on up to 1,600 channels at intervals as short as one second, says Todd Stanier, network solutions technical marketing, Yokogawa Corporation of America. Others can record more than a thousand samples per second. Acquired data can then be used to make a decision, alert an operator, or actuate a change in process, as desired.


ONLINE

Control Engineering provide more about .

 

Have a DAQ question? Post it to the “Ask Charlie” blog .


Do you keep data forever? Here's insight about "


Author Information

Mark T. Hoske, Control Engineering editor in chief, can be reached at MHoske@cfemedia.com




No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.