Create value with re-use

When you finish a project, begin working to catalog what was built, the standards used (and improved), and where and how that work could be applied in future. Not-invented-here syndrome is a common challenge in system integration and with engineering in general. See chart and table.

06/10/2013


How much re-use are you getting out of your projects? In other words, when you finish one project what parts can you directly apply to the next? As a specific example we often ask the question:

How many projects can a great Functional Design Specification (FDS) affect before the start of a project:

- One

How many projects can a great FDS effect after the project if time is taken to complete the as-built document, add screen-shots with callouts, and file with an appropriate version number in a public space for sharing?

- 10? 20? Many.

Why then do so many projects drop the ball after the project is complete and walk away without working to catalog what was built, the standards used (and improved) and where and how that work could be applied in future. Not-invented-here syndrome is a common challenge in system integration (and engineering in general) but if we can get move past this the potential for both individual project success as well as long term growth of the integration industry is huge. As a summary, the chart details the integration project costs (both as dollar and percentage values) for a two-plant install between continents.  The Plant 1 design and implementation contributed directly to Plant 2. All efforts listed represent direct integration costs only.

Software reuse drastically reduces system integration costs as this chart shows. Courtesy: Callisto Integration.

 

 

Software reuse drastically reduces system integration costs, as this table shows. Courtesy: Callisto IntegrationFurther to the direct integration benefits of re-use, client-centric benefits include:

 

Lower project risk – Components identified as new/different are noted as risk factors and engineering effort is spent up front mitigating that risk. As an example, a set of pre-built VM servers that can be re-used from project to project will lower the risk of incorrect software install order, unsupported patch installations, or other configuration errors, which can result in longer setup and commissioning time. 

 

·         Lower support cost – If the same standards are used across multiple sites or lines, the net training effort required for the organization drops significantly. As an example, a video-recorded training presentation which outlines application navigation and troubleshooting can be created and viewed in multiple plants and multiple languages with only one investment in content development.

 

·         Lower threshold for improvement – as an improvement is identified it can be quickly copied from one plant to another. As an example, a recipe improvement in one plant could be electronically submitted to another for next-day business return on investment (ROI).

 

·         Lower per-project design cost – Re-using software from one project to another has a direct, positive impact on business project management costs such as the total time required by H.B. Fuller employees in software reviews (43 vs. 2 as outlined in previous graph)

 

In summary: change your focus. What you do after commissioning should be held in as high regard as what you do before.

- Anthony Baker strikes again: Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration. This blog provides integration advice in plant-floor controls, manufacturing execution systems (MES), and manufacturing consulting, from the factory floor through to the enterprise. Andrew Barker, P.Eng., Callisto Integration, compiled the advice. www.callistointegration.com



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.