Control system upgrade increases efficiency over the weekend

02/14/2006


Process Control

Upgrading and automating a management control system has increased efficiency, maintainability, and reliability at this large coal export terminal.

Columbus, OH —Upgrading an aging, coal stockpile management control system led to increased operational efficiency for Kinder Morgan ’s Pier IX Terminal in Newport News, VA. With the help of River Consulting , a management, consulting, and engineering company, the facility installed the new system in a weekend. Benefits include more automated functions, improved alarming, enhanced displays with faster identification of and recovery from faults, and better blending and loadout controls.
The terminal is a major U.S. coal export facility that can handle 12 million tons annually with design transfer rates of 8,000 tons per hr for shipping and 5,000 tons per hr for receiving from rail cars. The original control system, installed in 1982, was becoming obsolete. The upgrade was accomplished with the addition of a new processor and HMI. Existing I/O equipment was retained.
The project consisted of replacing the control system processor and pushbutton control panel with a new processor and PC-based HMI terminals. As a result, interface screens could be developed to provide more control, monitoring, and diagnostic ability for operators. Re-use of existing field I/O equipment eliminated the need for system rewiring. By re-using existing I/O devices and networks, and performing a full system simulation and factory acceptance test on the software prior to field installation, the equipment could be installed in the short time frame.
Operators can now see all system I/O devices and equipment status on screen. Troubleshooting and diagnostics are simpler. The new PLC program is more powerful, and automated blending logic allows for more accurate control of blending operations. The addition of an Ethernet communications module lets operational data be viewed from management offices and transferred to data storage for additional analysis.

—Control Engineering Daily News Desk
Jeanine Katzel, senior editor, jkatzel@reedbusiness.com





No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.