SEARCH Archives
Loading
Sponsored by:

Construction, Buildings & Grounds

By Plant Engineering Staff

11/01/2008


Barrier system

The Spanguard safety barrier can stop up to 200 pounds of force with minimal deflection. Designed to separate and define work areas, the system features a 36-inch-tall curtain that stands 48 inches off the floor when in use. The system is engineered for easy installation and relocation; one person can operate it. Posts are equipped to accommodate two or more units per post. Curtains are available in 30- and 60-foot spans.

Rite-Hite Corp. : www.ritehite.com

Magnetic rack protection

Ultra-RackProtector Plus is designed to protect warehouse racking from damage from forklifts, pallet jacks and other equipment. Featuring a maintenance-free polyethylene construction, the guarding is equipped with heavy-duty magnets to hold it in place; no hardware is required. The units come in safety yellow and feature black warning stripes to provide visibility. Stackable for additional protection, the guarding works with racking up to 4 inches wide. Each 53/8x3

UltraTech International Inc. : www.facilityprotection.com

Under-leveler insulation kit

The Koozi under-leveler insulation kit is designed to stop the transfer of heat and cold through the deck plate of dock levelers. The 1-inch, closed-cell insulating foam features a vapor barrier and comes precut in 4-foot lengths that are 2 feet wide. It’s perforated at 1-inch intervals to facilitate installation; magnetic fasteners allow the material to be installed on most deck surfaces.

DL Manufacturing : www.dlmanufacturing.com

Barrier curtains

TZ insulated curtain walls come in three versions to support temperature separations of 15, 25 and 40 F. Custom engineered to ensure fit around corners and obstructions, the curtain walls suspend from ceiling joists or the roof deck. They include flexible Hypalon Superflex bottom sweep seals that seal against the floor to minimize energy loss and maintain temperature consistency. Curtain panels attach with Velcro. Options include fire-retardant fabric, vision panels and stainless-steel hardware, among others.

Zoneworks Flexible Industrial Barriers : www.zoneworks.com

Rolling grille door

The Spiral RG high-speed roll door features an opening speed of up to 100 inches per second. It offers top-to-bottom, full-width window slats, dual electric photo eyes and a reversing edge in the bottom bar, providing visibility and safety at the threshold. It’s engineered with no metal-to-metal contact for quiet operation, and it’s suitable for use in clean rooms and other controlled-access production environments.

Rytec Corp. : www.rytecdoors.com





No comments
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Find the fake! Counterfeit electrical equipment a clear and present danger
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results


Poll of the Week

What category most helps you select new products?
Recommendation from colleagues
Product of the Year winners
Supplier information
Trade show visit


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.