Compressed air: Find the leaks, lower the pressure, and measure the results

12/28/2012


The “better practice” would measure compressor power before and after reducing pressure so the reward can be more accurately quantified before impacting a variable that influences operations. Compressor load conditions relative to time would be required to estimate savings.

For centrifugal compressors, engineering data corrected to site conditions and ambient temperatures is essential to estimate any potential savings. Depending on ambient conditions and internal components used in a given compressor, reducing pressure may have no impact on power.

Reducing system pressure can also impact compressed air demand. A common misconception estimates potential savings as a function of peak demand and system pressure. The actual influence on demand is a function of the change in pressure at the point where the gas is expanded. A better estimate will require detailed monitoring and analysis of a given system across all load conditions. Although energy savings can be realized easily by simply reducing compressor and system pressure settings, it is typically executed as an event. Sustaining results can be challenging.

For any production issue associated with compressed air, pressure is the most frequently assumed problem. Most facilities will prioritize measured production results over assumed compressor energy savings. As a result, restoring pressure settings to previous or higher settings is the typical response. 

Measure the results

The “best practice” for compressed air systems requires a transition from executing random immeasurable events to a formal program with performance metrics and a team of individuals accountable for delivering monthly performance goals. When compressed air system performance goals are owned at the appropriate level within an organization, any negative variance is corrected. By focusing on delivering and sustaining reported results, compressed air system efficiency would be practiced regularly. With the appropriate level of visibility and accountability, an increase in leaks would be quantifiable, resulting in specific expectations with measurable results executed as a maintenance practice, not an isolated task. 

Mark Krisa is director of Ingersoll Rand’s Global Service Solutions.


<< First < Previous 1 2 3 Next > Last >>

ROBERTO , TX, Brazil, 01/11/13 04:55 PM:

A no load test , made in a holiday gives you also a good measure of your invisible losses
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.