City Hall Gets an Overhaul

Integrating Lighting and HVAC Retrofits: Case Study


Main Story                                                Case Study 1                                              Case Study 2

Constructed in the late 1920s, Columbus City Hall represents the art deco style that was very prominent throughout that era. While the building still has the original charm and character that it did when it was first built, the HVAC and lighting systems have aged significantly and are in need of an upgrade. The existing HVAC system is a hodgepodge of different systems that have been added and modified over the years.

The existing HVAC equipment will be removed and replaced with a new four-pipe fan coil system supplemented with dedicated outdoor air units (DOAU) to provide proper ventilation. The four-pipe fan coil system can prove to be 10% to 15% more efficient than a traditional variable air volume (VAV) system because the need for reheat has been eliminated and the DOAU can provide the minimum amount of outdoor air required. With a traditional VAV system, there is a tendency to over-ventilate a space because of the need to calculate outdoor air requirements based on the critical space method.

The majority of existing lighting at city hall consists of T12 fluorescent and incandescent lamps in a variety of fixture types that appear very dated. There are several historic pendants in many of the main hallways that use screw-in incandescent candelabras. Many of these historic luminaires have been retrofitted with replacement screw-in fluorescents, which have taken away from the historic look. These fixtures are being removed, shipped to a custom luminaire manufacturer, refurbished and cleaned, and then fit-out with LED light sources consistent to the original incandescent look. This will reduce the luminaires’ energy consumption by nearly 80% from their original incandescent versions and by more than 30% of their retrofit compact fluorescents.

The T12 parabolic and lensed troffers will be replaced with T5 volumetric type luminaires and T8 lensed troffers in the majority of spaces. It is anticipated that the new luminaires will be able to produce the same light levels that currently exist while reducing consumption by up to 30%. Changing from T12 to T5 luminaires will result in approximately a $1/sq-ft savings annually. There is more than 90,000 sq-ft of space being renovated at city hall, resulting in a $90,000 savings. This number does not take into account additional savings that will be witnessed by occupancy sensor and time of day control automatic lighting control.

A major culprit of energy consumption at city hall is the exterior floor lights, 400 and 1000 W metal halide drum-style flood lights that consume 460 and 1080 W, respectively. The total exterior consumption is 36,960 W. These are being replaced by LED wall washers and flood lights that consume a mere 30 W each. The total wattage of the new LED system that is capable of producing any color in the spectrum as called for by the city of Columbus for special events is 4160 W. This is a reduction of 89% and can yield a payback of less than seven years, even with the significant investment for color-changing LEDs upfront. It currently costs the city approximately $26/night to run the metal halides; this number will be reduced to $3/night, based on an 8-hour night at $0.09 per kWh.

With these lighting and HVAC changes, the city hall renovation is in the process of pursuing U.S. Green Building Council LEED Certification.


Return to:

Integrating Lighting and HVAC Retrofits: Main Story

Integrating Lighting and HVAC Retrofits: Complex Office Building Retrofit (Case Study)



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Sister act: Building on their father's legacy, a new generation moves Bales Metal Surface Solutions forward; Meet the 2015 Engineering Leaders Under 40
2015 Mid-Year Report: Manufacturing's newest tool: In a digital age, digits will play a key role in the plant of the future; Ethernet certification; Mitigate harmonics; World class maintenance
2015 Lubrication Guide: Green and gold in lubrication: Environmentally friendly fluids and sealing systems offer a new perspective
Drilling for Big Data: Managing the flow of information; Big data drilldown series: Challenge and opportunity; OT to IT: Creating a circle of improvement; Industry loses best workers, again
Pipeline vulnerabilities? Securing hydrocarbon transit; Predictive analytics hit the mainstream; Dirty pipelines decrease flow, production—pig your line; Ensuring pipeline physical and cyber security
Cyber security attack: The threat is real; Hacking O&G control systems: Understanding the cyber risk; The active cyber defense cycle
Designing positive-energy buildings; Ensuring power quality; Complying with NFPA 110; Minimizing arc flash hazards
Building high availability into industrial computers; Of key metrics and myth busting; The truth about five common VFD myths
New industrial buildings: Greener, cleaner, leaner; New building designs for industry; Take a new look at absorption cooling; Offshored jobs start to come back

Annual Salary Survey

After almost a decade of uncertainty, the confidence of plant floor managers is soaring. Even with a number of challenges and while implementing new technologies, there is a renewed sense of optimism among plant managers about their business and their future.

The respondents to the 2014 Plant Engineering Salary Survey come from throughout the U.S. and serve a variety of industries, but they are uniform in their optimism about manufacturing. This year’s survey found 79% consider manufacturing a secure career. That’s up from 75% in 2013 and significantly higher than the 63% figure when Plant Engineering first started asking that question a decade ago.

Read more: 2014 Salary Survey: Confidence rises amid the challenges

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.