CIP Networks Testing: Interoperability, performance, conformance, recommended practice

The idea that devices can conform to a specification and may not interoperate can confound end-users, system integrators, and device manufacturers alike. ODVA and its members have been working to close that gap with conformance, interoperability and performance tests. See photos.

03/24/2009


ODVA organizes PlugFest events to boost interoperability.

Workshops and "PlugFest" events from ODVA help ensure interoperability among CIP-enabled devices.

ODVA organizes PlugFest events to boost interoperability.

Howey-in-the-Hills, FL – The idea that devices can conform to a specification and may not interoperate can confound end-users, system integrators, and device manufacturers alike. ODVA and its members have been working to close that gap with conformance, interoperability and performance tests, along with recommended practices for Common Industrial Protocol (CIP) networks from ODVA .
ODVA’s device conformance tests provide a declaration of conformity (DOC) to devices deemed to conform to the specification by passing protocol, physical layer, and interoperability tests. ODVA also offers device manufacturers (vendors) other ways to work toward better interoperability.
The EtherNet/IP implementor workshop series runs in North America and in Europe. Each series ends with a multi-vendor interoperability event called “PlugFest” in each region. Kevin Knake of HMS Industrial Networks is the chair of the North American workshop series. Viktor Schiffer of Rockwell Automation is the chair for the European series. While HMS and Rockwell are among ODVA members, non-members may participate in the events.

ODVA 2009 CIP Networks Conference: other news

- CIP networks: 24 V dc Power with Ethernet specification expected in April ;
- Economist identifies hazards, opportunities for manufacturing, engineering ;
- ODVA, DeviceNet: New CIP specs; ControlNet added; 2009 meeting ; and
- 10 benefits of Common Industrial Protocol networks, according to ODVA .

Knake says that knowledge gained during workshops and PlugFests helps clear ambiguity in the EtherNet/IP specification, helping vendors achieve interoperability more quickly. Workshops and PlugFests organizers expect to develop a troubleshooting guide along with recommendations for web diagnostics and security, network behaviors, IP address assignments, and testing for multiport devices.
This work by ODVA and its members “aims to accelerate adoption of EtherNet/IP and promote interoperability of devices from multiple vendors to improve user experiences,” Knake says, noting that, at present, devices can conform with specifications and not interoperate.
For those making EtherNet/IP-compliant devices, PlugFest participation gets them closer to pleasing customers. An average of 52% of products comply with the PlugFest test suite, Knake says; participants use lessons learned to improve devices before products are introduced. Identifying compliance issues earlier in the product development cycle costs as little as one-tenth of what it would have cost to fix after the product is introduced.
ODVA also has launched EtherNet/IP performance testing. These tests, run at ODVA’s test labs, aim to provide users with data on product network performance. That information helps match product performance to application requirements. Tests measure network performance, including type and number of network connections supported and the time elapsed between frames of network traffic. Vendors then can build on the interoperability testing offered at PlugFest, providing greater understanding about what devices can do for which applications.
The route to ODVA device interoperability for CIP networks
Efforts toward interoperability include:

  • Conformance : Standard device conformance testing provides an ODVA “Declaration of Conformity” (or “DOC”) for those devices that pass that test suite, showing compliance with the specification.

  • Interoperability and performance tests : Devices that go through PlugFest or ODVA performance tests successfully can have their DOC updated to indicate this. Within PlugFest testing is a limited performance test, which devices now are required to pass to pass the PlugFest testing. A comprehensive performance test is also run by ODVA at its labs, and this performance test includes a report.

  • Recommended practices : These are developed between specifications updates, passing along new knowledge to vendors. As the name suggests, these are not required, Knake says, but desirable, since they increase the probability of interoperability.


Next PlugFest is May 5-7 : ODVA provides details on EtherNet/IP North American PlugFest #11 , located in Ann Arbor, MI. Registration deadline is April 28, 2009; non-members may attend.
- Mark T. Hoske, editor in chief
Control Engineering News Desk
Register here .





No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.