Case study: Bundling performance

Although LCCA of individual system alternates is often valuable, it is important to recognize the whole building return on investment that is the basis for a building’s overall success. A brief example of such an analysis is included here for the Stanford Yang and Yamazaki Environment and Energy Building.

03/21/2012


Figure 4: This LCCA shows six sequential strategy bundles and the predicted summation building bundle in red at the time of design. Courtesy: ArupThe results show the diversity of financial returns when energy investments are grouped into load reduction, passive systems, active efficient systems, energy recovery, self generation, and renewable energy offsets. The bold red line indicates the bundled performance of all strategies taken together. The results of this analysis helped convince Stanford University to elevate the performance of all future new and retrofit projects to a LEED Gold/Platinum level of energy performance.

Post-occupancy review

Figure 5: This chart models the effect of a post-occupancy performance audit and incentive award. Courtesy: ArupEnergy consumption models developed during building design rarely match actual operating energy consumption when buildings are built and operated. Instead, energy models produced during design are intended to be indicative of relative performance between a code-derived baseline model (e.g., ASHRAE 90.1 or Title 24 compliant) and a design model reflecting the actual building design.

Figure 6: This conceptual diagram illustrates the stack driven natural ventilation system. Courtesy: ArupThe focus on relative versus actual consumption is widely considered acceptable and is attributed to differences between simulation assumptions and actual operating conditions that influence energy consumption. Such conditions include changes to scheduling of equipment and lighting, occupancy density and behavior, climate variation, construction variances, and improper or incomplete commissioning. Some of these conditions are appropriate and can be addressed in a calibrated model, while others reflect an area of physical or operational deficiency that should be remedied.

Comparison and scenario evaluation of the Y2E2 facility post-occupancy showed that it uses more energy in absolute terms than the design stage model predicted. It also showed that the building saves more energy than initially predicted. As a result, there are larger absolute cost savings that actually provided a better return on investment. It should be noted that the percentage increase in relative energy performance remained consistent and only the absolute values varied. The caution from this review is that even though building physics can predict the relative performance of a building well, the absolute measure is more difficult, highlighting the need for rigorous sensitivity studies.

Roberts is an associate principal and energy and resources business leader in Arup’s San Francisco office. His experience ranges from climate-responsive building engineering and consulting to community energy systems, net-zero energy, and climate-positive design. Rhodes is a senior engineer in Arup’s San Francisco office, specializing in high-performance mechanical system design and energy monitoring. Hespe is a senior energy and sustainability designer in Arup’s San Francisco office, specializing in passive and ecological building design.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.