Building Manufacturing Efficiency

Today, many pharmaceutical plants typically operate at somewhere around 30% efficiency, with a few world-class operations reaching the 70% range. However, even these stars fall below the levels that other well run conventional process manufacturing operations achieve, where efficiencies of over 90% are routine.

02/01/2008


Today, many pharmaceutical plants typically operate at somewhere around 30% efficiency, with a few world-class operations reaching the 70% range. However, even these stars fall below the levels that other well run conventional process manufacturing operations achieve, where efficiencies of over 90% are routine. Globalization is forcing all companies, and especially pharmaceutical industries, to develop competitiveness strategies and deploy them quickly if they expect to remain in business. All this tells us that we must not only look aggressively for ways to make our manufacturing operations competitive, but also deploy the technologies that will allow us to measure and substantiate that competitive advantage. Pfizer has found a way to put such processes into practice, with exceptional benefits.

Overall equipment effectiveness (OEE) is a key metric that many companies are using to measure plant or line efficiency. OEE calculation results can be used for many operational diagnostics:

  • Understand how well we are performing with an objective yardstick;

  • Identify and eliminate constraints;

  • Define target areas for improvement; and

  • Align those targets with larger business strategy.

OEE measurements allow managers to make more effective, more objective, and more informed decisions in real time.

In November 2006, the Pfizer facility in Vega Baja, Puerto Rico formed a cross-functional team to focus on creating more competitive costs through implementing an OEE data gathering and reporting system.

This important initiative, a collaborative effort between the regional manufacturing engineering and technology (ME&T) team, IT, and Vega Baja packaging teams, set out to improve data collection and visibility for determining OEE for packaging lines in the Puerto Rico region. This initiative was identified as critical and imperative to manufacturing success in today’s dynamic business environment.

Crude but effective

Experiences with OEE in the Vega Baja facilities started out as manual processes developed by Juan C. Figueroa, a packaging technical specialist, and Xavier Schlienger, a packaging team leader, when they implemented it successfully at two blister lines.

While the manual system was cumbersome, the value of the information it generated was clear, so the next step was to move the process to the next level and see how data collection could be automated. That process began with automating the forms but still having operators enter data manually into the terminals. This reduced the amount of data entry, provided OEE metrics much sooner, and generally improved the quality of the process.

In December 2006, Figueroa joined Jose Santos, Mark Poham, Vik Sharma and Edwin Rivera in an effort to develop and implement a still more user-friendly system to collect additional OEE data that would provide visibility of the results to the shop floor operators and also to management. One of the major long-term requirements of the project was building in capabilities for the system to gather real time data directly from the equipment and be expandable to other areas of the manufacturing process.

Pfizer global manufacturing (PGM) corporate IT had worked on the development of a manufacturing data reporting system called PfindIT (Pfizer factory intelligence network dashboard-IT), but the system lacked a user-friendly graphical interface and OEE reports. A team consisting of colleagues from PGM IT, regional IT, and packaging was assembled to define user requirements and work with the system vendor to develop the graphical user interface and reports required.

The team brought in long-time vendor partner GE Fanuc Automation to assist with the project. GE Fanuc’s production management software system, Proficy Plant Applications, has an efficiency module that seemed to fit the bill. This module is able to identify and monitor all areas of manufacturing for inefficiencies, perform root cause analyses, compile historical data summaries, schedule reports, and control OEE.

The biggest challenge was to complete the development and deployment by the first quarter of 2007. Working over the year-end holidays, the team completed a pilot system in one of the packaging lines in Vega Baja which was working in January, 2007. Deployments then continued with the rest of the 12 packaging lines. The tool was accepted by the shop floor operators immediately, setting off a wave of friendly competition between operators to demonstrate whose line was the most efficient.

Implementing the new system brought a higher level of measurement consistency across the business. Different departments and sites had created their own techniques which made for results that could not be compared directly. With the new system in place, data collection was restructured for uniformity and aligned with the goals of the business. For the sake of consistency, the global packaging team with the help of Pfizer global engineering (PGE) defined two standard OEE calculations that are currently integrated into the system.

Real results, OEE

Watching improvements from these efforts is very rewarding. OEE numbers for 2004 were only around 30%. But by 2006, we were hitting 50% consistently, which is more than a 50% overall improvement. Perhaps that doesn’t look like much, but an OEE of 30% is equal to 2.4 hours of productive time, while an OEE of 50% equals 4.0 hours of productive time, an improvement of 1.6 hours. The OEE monitoring system provides a tool for operators and supervisors to target areas of improvement continuously. For 2007 we expect even higher savings since standard hours required to operate two packaging lines were reduced by 40% per line per shift. This is an example of the type of continuous improvement possible and achievable once you have visibility of your process and operations.

The development of the system has been such a success that the global packaging team has adopted it as the official tool for OEE measurement. Today, other Pfizer sites in Latin America, including Puerto Rico, Mexico, and Brazil are evaluating how they can implement the system as a way to build the competitive advantages within the Pfizer network.

The team is currently working on Phase II of the project that will collect data automatically, directly from shop floor PLCs and SCADA systems. The collaboration in this project has proven to be an excellent demonstration of what “One IT” is all about.



Author Information

Jose Marrero Diaz is Latin American & Puerto Rico region IT director/team leader for Pfizer. Reach him at jose.marrero2@pfizer.com .




No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.