Building automation, controls in mixed-use buildings

Engineering mixed-use buildings is a fine art—specifiers must combine multiple engineered systems for several business and residence types into one structure. Building automation and controls can be complex, and system integration is key.

09/16/2013


Robbie Chung, PE, LEED AP, Senior associate, Environmental Systems Design Inc., Chicago. Courtesy: ESDRaymond Holdener, PE, Senior associate, Dewberry, Fairfax, Va. Courtesy: DewberryAndrew Lasse, PE, LEED AP, Associate principal/senior mechanical engineer, Interface Engineering, Portland, Ore. Courtesy: Interface EngineeringGary Pomerantz, PE, LEED AP, Executive vice president, building systems, WSP, New York City. Courtesy: WSP GroupJohn Sauer, PE, LEED AP, Senior director, BSA LifeStructures, Indianapolis. Courtesy: BSA LifeStructuresLeJay Slocum, Assistant director, Atlanta regional office, Aon Fire Protection Engineering Corp., Suwanee, Ga. Courtesy: Aon Fire Protection

Participants:

Robbie Chung, PE, LEED AP, Senior associate, Environmental Systems Design Inc., Chicago

Raymond Holdener, PE, Senior associate, Dewberry, Fairfax, Va.

Andrew Lasse, PE, LEED AP, Associate principal/senior mechanical engineer, Interface Engineering, Portland, Ore.

Gary Pomerantz, PE, LEED AP, Executive vice president, building systems, WSP, New York City

John Sauer, PE, LEED AP, Senior director, BSA LifeStructures, Indianapolis

LeJay Slocum, Assistant director, Atlanta regional office, Aon Fire Protection Engineering Corp., Suwanee, Ga.

 


CSE: What factors do you need to take into account when integrating automation and controls systems on mixed-use projects?

Pomerantz: Depending on how integrated or separate the building constituents choose to be, the automation systems can be fully integrated or entirely separate. The only exception to this is the fire alarm system, which must be integrated by code and good practice. Typically in mixed-use projects, each constituent has an independent system that is able to communicate critical information between them. The more integrated the MEP systems are with each other, the more integrated the building management system (BMS) also is. For example, if a common heating and cooling plant is used between the constituents, then the BMS tends to be more integrated such that the operation of these plants can be more easily optimized.

Chung: The delineation of the network backbone needs to be carefully considered between building usages with multiple owners or engineering staff. Early confirmation should be made on what the end-user intent will be to ensure each operator will have his or her own workstation and network associated to the respective equipment as required. Network security is also a hot topic that should be thoroughly evaluated to ensure the risk of being hacked is minimized. If a single building automation system (BAS) is used across multiple users, secure access should be carefully analyzed.

Lasse: The first question that needs to be addressed is whether to use a full building automation system (BAS) or stand-alone controls. This will depend on the uses for the building, the owner’s expectations, sustainability and metering targets, as well as the budget. We’ve found significant cost savings in stand-alone low-voltage controls on mixed-use residential projects that are not implementing a central HVAC system. However, projects need to be looked at holistically—a full BAS can provide a higher level of flexibility, troubleshooting, metering, and trending to provide valuable feedback for building owners, and is a must for central plant systems in mixed-use buildings.

Holdener: An overall management system should be planned for at the beginning of the project so that the building as a whole can use the same automation system. Therefore, the system must be specified so that it is an open protocol system that can be connected to various types of equipment so that all of the systems can work together. The system must be specified as expandable for the future.

CSE: What aspect of building automation systems (BAS) is most overlooked?

Holdener: Centralized BAS monitoring and control of individual dwelling unit HVAC systems, particularly where dwelling units tend to be unoccupied for extended periods of time and the HVAC system can be shut down entirely. For example, a condominium unit owner in a northern climate vacates to a southern climate for the winter months, turning off the HVAC system so the interior space conditions can reach relatively low temperature conditions depending on the outdoor ambient and adjacent space conditions. If that condo unit gets too cold, adjacent walls, floors, and ceilings can experience higher than expected heat transfer from the adjacent warmer spaces. If that condo unit gets cold enough, piping could burst. It would be beneficial for the BAS to have an interface with each condo unit’s HVAC system to monitor and control the system to maintain reasonable indoor temperature conditions at all times. Many times, the BAS controls the central HVAC system and equipment (cooling towers, pumps, boilers, “common area” air handling units, etc., for a water-source heat pump system), but the dwelling unit heat pumps have stand-alone controls so are not controlled or even monitored by the BAS. Energy monitoring of utility meters and submeters is another area commonly overlooked or deleted from the BAS during the VE process.

Pomerantz: Most often overlooked is the real-world operations of buildings and how building operations staff actually use BMS systems in their buildings. Operations staff tend not to operate the buildings on fully automatic operation because they know certain nuances of their buildings and how they are occupied and used.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.