Bridge safety: System uses acoustic emission to detect compromised suspension cables

As part of a range of measures to safeguard the M48 Severn Suspension Bridge, authorities plan to install a full acoustic emission wire-break detection system for 1,673 meters of each suspension cable. See photo.

08/28/2008


Princeton Junction, NJ Physical Acoustics Limited (PAL), MISTRAS Group Inc ., has teamed up with Severn River Crossing (SRC) and the Highways Agency to monitor the main cables of the M48 Severn Suspension Bridge, which links England to South Wales in the UK.


The M48 Severn Suspension Bridge, which opened in September 1966, has recently undergone invasive investigation of the main cable that revealed corrosion in the individual steel wires and a small number of broken wires. As part of a range of measures to safeguard the structure, SRC appointed PAL to supply and install a full Acoustic Emission (AE) wire-break detection system over the whole 1,673 m (5,487 ft) of each cable.
The acoustic monitoring system listens continuously for sounds from individual wires within the main cable to keep track of the rate and location of any further wire breaks. It uses 90 acoustic emission sensors attached to cable clamps every 36 m along the cable. These passive sensors detect and amplify signals from within the main cable. These data are then processed automatically by one of six local “sensor highway” systems distributed along the bridge on an optical fiber network.
PAL says the use of distributed monitoring systems significantly reduces the amount of cabling required, installation cost, and weight. The six sensor-highway systems are synchronized and report to a base-station on the network, which further processes data and automatically reports time and location of potential wire breaks through a secure Website by email, enabling very efficient, low cost, long term monitoring.
The monitoring system will enhance the ability of the Highways Agency to evaluate the health of this structure and pinpoint regions that might require further invasive cable investigation, currently planned for 2010.
C.G. Masi , senior editor
Control Engineering
Register here and scroll down to select your choice of eNewsletters free.





No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.