Vertical plumbing in a tight space is shown in this installation model. Courtesy: GHT LimitedPlumbing design can be more complicated in Revit than HVAC or electrical design because it deals with sloped piping, a sanitary drain vent, storm drain lines, and so on. The latest versions of Revit have improved the ability to design sloped piping, though it can be time consuming if you need to connect multiple sloped pipes together and retain the slope with the correct fittings. The plumbing design also requires lots of piping in small spaces. In addition, plumbing design in AutoCAD is typically schematic in nature, so it requires a shift in mind-set for designers to start thinking of their components as real-life objects and how they will be installed during construction.

Here is some advice on common situations plumbing designers face in Revit. 

Time savers: Designers transitioning to Revit often comment that it takes more time to accomplish a task in Revit than it does in AutoCAD. Consider the following to shave time from your workflow: 

  • Revit is a graphical database. Plumbing involves repetitive design components, so if you save common designs in groups you can reuse them on future projects—similar to blocks in AutoCAD. In Revit, it can be faster to reconfigure the design than to start from scratch. GHT Limited’s team designed a standard pump room with all the components and piping in Revit, and created a group. Copying this standard into new projects and reconfiguring it has saved us many billable hours when the building types are similar. As we all know, no two buildings are exactly alike when it comes to the layout and utility connections, though in many cases you should be able to use similar types of pumps, fittings, and accessories.
  • If you’re under deadline pressure and have to delegate plumbing work to colleagues who are not proficient in Revit, they can draw in CAD and the files can be linked to a drafting view, and later incorporated into Revit. Any changes required on the CAD file can be made in the CAD file, and you can manage the link to Revit for automatic updates. This is most helpful if you are new to using Revit and are under pressure to get your portion completed on time. Once you become more efficient in Revit, we would recommend avoiding this practice, as it can decrease the operational speed of the overall Revit model and reduce productivity. In addition, we have found difficulties with plotting sheets linked in from CAD with respect to fonts and other items that are not necessarily compatible with Revit.
  • Drafting views create a view showing details that are not directly associated with the building model, like riser diagrams and detail sheets. This approach works well for supporting information, like riser diagrams, cover sheets, and details.
  • Revit lets you design pipe placeholders. This is especially helpful for large buildings; you can simply touch a button and they update throughout the model. However, many users have found it more useful to complete the work within standard Revit piping systems and change pipe sizes as required by selecting individual sections or whole systems in place of this element. In addition, we recommend using placeholders only during the schematic design phase.
  • If you have a pipe that runs above and below the floor, the program has tools that make it easy to tap into pipes at the same and different elevations. It also has a visibility that shows when piping is below the view range; this is discussed in more detail in the section on visibility
  • Typically you won’t know all pipe sizes until the layout is finished, but that doesn’t mean you should wait to get started until the end of the design process. Tag each pipe with an estimated size before you exit your drawing; when you go back, you can quickly update the information if necessary
  • Practice every day whether you’re working on a Revit job or not. Even spending 10 minutes a day using Revit can help you maintain your skills, and reduce retraining time in the future.


No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2015 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
Each year, a panel of Control Engineering and Plant Engineering editors and industry expert judges select the System Integrator of the Year Award winners in three categories.
2017 Lubrication Guide; Software tools; Microgrids and energy strategies; Use robots effectively
Prescriptive maintenance; Hannover Messe 2017 recap; Reduce welding errors
Safety standards and electrical test instruments; Product of the Year winners; Easy and safe electrical design
Infrastructure for natural gas expansion; Artificial lift methods; Disruptive technology and fugitive gas emissions
Mobility as the means to offshore innovation; Preventing another Deepwater Horizon; ROVs as subsea robots; SCADA and the radio spectrum
Future of oil and gas projects; Reservoir models; The importance of SCADA to oil and gas
Diagnostic functions for system safety; Specifying industrial enclosures; Effective decision support for a crisis
Transformers; Electrical system design; Selecting and sizing transformers; Grounded and ungrounded system design, Paralleling generator systems
Natural gas for tomorrow's fleets; Colleges and universities moving to CHP; Power and steam and frozen foods

Annual Salary Survey

Before the calendar turned, 2016 already had the makings of a pivotal year for manufacturing, and for the world.

There were the big events for the year, including the United States as Partner Country at Hannover Messe in April and the 2016 International Manufacturing Technology Show in Chicago in September. There's also the matter of the U.S. presidential elections in November, which promise to shape policy in manufacturing for years to come.

But the year started with global economic turmoil, as a slowdown in Chinese manufacturing triggered a worldwide stock hiccup that sent values plummeting. The continued plunge in world oil prices has resulted in a slowdown in exploration and, by extension, the manufacture of exploration equipment.

Read more: 2015 Salary Survey

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.
The maintenance journey has been a long, slow trek for most manufacturers and has gone from preventive maintenance to predictive maintenance.
Featured articles highlight technologies that enable the Industrial Internet of Things, IIoT-related products and strategies to get data more easily to the user.
This digital report will explore several aspects of how IIoT will transform manufacturing in the coming years.
Maintenance Manager; California Oils Corp.
Associate, Electrical Engineering; Wood Harbinger
Control Systems Engineer; Robert Bosch Corp.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me