BIM and fire protection engineering


Clash detection and commissioning 

For large buildings that have tenant improvements, a BIM could be an ideal tool. Casinos in Las Vegas are continually modifying and improving their environments to stay on top of trends, attract new customers, and maintain loyal customers. Each improvement requires documentation with the local authorities having jurisdiction (AHJ); however, without an overall plan identifying each of the small changes, a building could completely reinvent itself such that compliance becomes questionable.

Figure 2: Manufacturers can provide information about each piece of equipment, including where to find more information. This screenshot of a packaged special suppression system allows users to select the cabinet and its properties and identifies the info

Having a model established for a property allows the owners and designers to understand the impacts to the overall property when even small changes are made. Changing a retail store to a restaurant may not seem like a significant revision. However, if the occupant loads increase beyond available capacity or the kitchen floor drains penetrate an exit passageway below, there may be more costly impacts to the overall building that a model could mitigate. Modeling might be able to identify conflicts or issues with certain design elements early in the design or planning stage. 

The ease of accessing a model rather than drawings applies to many disciplines. Smoke management systems are often designed, tested, and/or commissioned by fire protection engineering specialists. They often involve multiple systems such as sprinkler waterflow switches, smoke detectors, dampers, and fans. Having a well-established and maintained BIM model allows each trade to identify not only its equipment but also the equipment it interacts with.

During commissioning of the smoke management system, it is often difficult to carry around the sprinkler, fire alarm, mechanical, and architectural drawings that show all of the related components. Having a tablet that connects to a cloud model would greatly improve efficiency. As the commissioning commences, portions of the system are marked with the appropriate information about commissioning that takes place directly in the model. Pressure tests and inspection of ducts, fan start-up, and measurements are all directly recorded in the model and associated with the respective equipment. If specific components fail, they can be red-flagged for follow-up. Integration with the model would allow for all the detailed commissioning information to carry on through the life of a building. 

When testing and inspections are complete, the model serves as a database to generate reports of tests conducted and inspections observed. During final testing and commissioning, if portions of a system fail to operate properly, information on specific equipment tests can be viewed directly from the model. After handover, reports of failures from testing and commissioning can be reviewed so that if recurrent problems exist, the system(s) can be modified to correct them. The model can also serve as a database for how the system performed at start-up so future revisions can be evaluated.

No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
A cool solution: Collaboration, chemistry leads to foundry coat product development; See the 2015 Product of the Year Finalists
Raising the standard: What's new with NFPA 70E; A global view of manufacturing; Maintenance data; Fit bearings properly
Sister act: Building on their father's legacy, a new generation moves Bales Metal Surface Solutions forward; Meet the 2015 Engineering Leaders Under 40
Cyber security cost-efficient for industrial control systems; Extracting full value from operational data; Managing cyber security risks
Drilling for Big Data: Managing the flow of information; Big data drilldown series: Challenge and opportunity; OT to IT: Creating a circle of improvement; Industry loses best workers, again
Pipeline vulnerabilities? Securing hydrocarbon transit; Predictive analytics hit the mainstream; Dirty pipelines decrease flow, production—pig your line; Ensuring pipeline physical and cyber security
Upgrading secondary control systems; Keeping enclosures conditioned; Diagnostics increase equipment uptime; Mechatronics simplifies machine design
Designing positive-energy buildings; Ensuring power quality; Complying with NFPA 110; Minimizing arc flash hazards
Building high availability into industrial computers; Of key metrics and myth busting; The truth about five common VFD myths

Annual Salary Survey

After almost a decade of uncertainty, the confidence of plant floor managers is soaring. Even with a number of challenges and while implementing new technologies, there is a renewed sense of optimism among plant managers about their business and their future.

The respondents to the 2014 Plant Engineering Salary Survey come from throughout the U.S. and serve a variety of industries, but they are uniform in their optimism about manufacturing. This year’s survey found 79% consider manufacturing a secure career. That’s up from 75% in 2013 and significantly higher than the 63% figure when Plant Engineering first started asking that question a decade ago.

Read more: 2014 Salary Survey: Confidence rises amid the challenges

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.