BIM and fire protection engineering

04/22/2013


Clash detection and commissioning 

For large buildings that have tenant improvements, a BIM could be an ideal tool. Casinos in Las Vegas are continually modifying and improving their environments to stay on top of trends, attract new customers, and maintain loyal customers. Each improvement requires documentation with the local authorities having jurisdiction (AHJ); however, without an overall plan identifying each of the small changes, a building could completely reinvent itself such that compliance becomes questionable.

Figure 2: Manufacturers can provide information about each piece of equipment, including where to find more information. This screenshot of a packaged special suppression system allows users to select the cabinet and its properties and identifies the info

Having a model established for a property allows the owners and designers to understand the impacts to the overall property when even small changes are made. Changing a retail store to a restaurant may not seem like a significant revision. However, if the occupant loads increase beyond available capacity or the kitchen floor drains penetrate an exit passageway below, there may be more costly impacts to the overall building that a model could mitigate. Modeling might be able to identify conflicts or issues with certain design elements early in the design or planning stage. 

The ease of accessing a model rather than drawings applies to many disciplines. Smoke management systems are often designed, tested, and/or commissioned by fire protection engineering specialists. They often involve multiple systems such as sprinkler waterflow switches, smoke detectors, dampers, and fans. Having a well-established and maintained BIM model allows each trade to identify not only its equipment but also the equipment it interacts with.

During commissioning of the smoke management system, it is often difficult to carry around the sprinkler, fire alarm, mechanical, and architectural drawings that show all of the related components. Having a tablet that connects to a cloud model would greatly improve efficiency. As the commissioning commences, portions of the system are marked with the appropriate information about commissioning that takes place directly in the model. Pressure tests and inspection of ducts, fan start-up, and measurements are all directly recorded in the model and associated with the respective equipment. If specific components fail, they can be red-flagged for follow-up. Integration with the model would allow for all the detailed commissioning information to carry on through the life of a building. 

When testing and inspections are complete, the model serves as a database to generate reports of tests conducted and inspections observed. During final testing and commissioning, if portions of a system fail to operate properly, information on specific equipment tests can be viewed directly from the model. After handover, reports of failures from testing and commissioning can be reviewed so that if recurrent problems exist, the system(s) can be modified to correct them. The model can also serve as a database for how the system performed at start-up so future revisions can be evaluated.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.