Best practices in preventive maintenance: How one company did it

Part three of this 3-part series on preventive maintenance explains that companies committed to a PM program succeed because they have clearly defined what they wanted to achieve. Link to part 1 and part 2 below.

12/30/2015


Companies with well-planned PM programs enjoy minimal unplanned downtime, minimal spare parts costs, minimal manufacturing interruptions from breakdowns, maximum manufacturing times, maximum product quality and longer machine life spans. Courtesy: CFE MedCompanies with well-planned preventive maintenance (PM) programs enjoy minimal unplanned downtime, minimal spare parts costs, minimal manufacturing interruptions from breakdowns, maximum manufacturing times, maximum product quality and longer machine life spans. These companies have done their homework upfront. They have chosen to take advantage of the available physical and financial advantages that a PM program can provide.

These companies have also made the commitment to getting a PM program in place that is flexible, manageable, and sustainable for the long term. What were the key drivers of the success? The manufacturer began their PM program design by clearly defining what they wanted to achieve:

  • Uninterrupted manufacturing runs by eliminating machine breakdowns
  • Increased product quality
  • Decreased capital expenditures by increasing machine lifespans and reducing spare parts costs

On top of that, this exemplary manufacturer:

  • Made the tough decision to temporarily reassign their top mechanics to assist in writing PM inspection details. These mechanics understood the machines' physical operation, which components failed and why, and the mean time between failures.
  • Purchased small inexpensive infrared temperature guns for all their mechanics. This helped the mechanics check operating temperatures of machine bearings, couplings, motors and gearboxes during their normal working shifts. The goal was to flag and address above-normal temperatures before failures occurred.
  • Utilized written feedback from corrective work orders to constantly change and enhance their existing PM program. For corrective type work order (WO), mechanics were required to write their root cause analysis, and the solution applied, on the hard copy of their corrective work orders. The PM program coordinator reviewed all corrective WO feedback after they were completed and made changes to PM's when needed.
  • Kept their equipment extremely clean, which enabled maintenance team to easily spot any leaks or debris from component wear.
  • Installed small auto-lube units to provide automatic lube dispersion on a timed basis. These units were installed on critical bearings and machine components that received daily high pressure wash downs and were subject to harsh environmental issues. More comprehensive auto-lube systems were being engineered for automatic lube dispersion on a larger scale to many components throughout the plant.
  • Utilized lubrication vendors to assist them in designing their lube program, and used these vendors on an ongoing basis to help monitor lube effectiveness and make continuous improvements on possibly changing the lube type, application quantity and frequency.
  • Published the individual successes of the existing PM's to their maintenance tradespeople and kept them up to date with CI changes. This helps eliminate the old-school "fix it when it breaks" mentality and encouraged the company's new preventive maintenance culture.

What can a company expect if they assign qualified employees to plan and manage their PM program? What can an outside contractor bring to the mix.

But the companies that have poor or no PM programs certainly gain the most from outside support, especially if the plant equipment is old and not maintained, if spare parts storage is not well managed, if there's no maintenance training or if there's no discipline within the maintenance department. 

PM cost savings will obviously vary based on each company's unique products and manufacturing processes. However, one frequent benefit of PM is a reduction in overtime wages and equipment run times to catch up on production schedules that were interrupted by unplanned breakdowns. These PM benefits are often overlooked when companies accrue cost savings.

Bring in experts who have been there

A lack of implementation expertise is the number one reason that PM programs fail.

The right professional assistance can help all companies develop a PM correctly from the start, support its internal PM team, and keep the momentum going. Make sure the people helping have 'been there and done that'. The best team for the job includes people who have held maintenance management positions, have gone through the steps and have been held responsible for outcomes.

The size of the PM development team will depend on the size and complexity of the facility but in general, it should be relatively small: one project manager and one or two people who will design and implement the program and train your internal team.

This article is part 3 of a 3-part series on preventive maintenance.

Link to part 1: Why preventive maintenance fail and how to fix it.
Link to part 2: Six steps to design a preventive maintenance program.

Daniel Penn Associates senior consultant Ken Staller has more than 30 years of project engineering, project management and maintenance management experience in machine manufacturing, pulp and paper, pharmaceutical and automotive industries. Daniel Penn Associates is a CFE Media content Partner. Edited by Erin Dunne, production coordinator, CFE Media, edunne@cfemedia.com.



Charles , Non-US/Not Applicable, South Africa, 01/14/16 10:22 AM:

My feeling is that a PM program on its own is not the best solution in 2016.
My belief ( please correct me if I am wrong) is that PM is only one of 3 pillars of the modern maintenance program; the other 2 being Proactive Maintenance and possibly the most important , Predictive Maintenance.PM on its own wastes time and money performing tasks which are possibly not needed, but done anyway as the program demands.
From the statistics available, a Predictive maintenance program will save at least 30% in costs over a PM program, with a payback period under 3 years.
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2015 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
2016 Product of the Year; Diagnose bearing failures; Asset performance management; Testing dust collector performance measures
Safety for 18 years, warehouse maintenance tips, Ethernet and the IIoT, GAMS 2016 recap
2016 Engineering Leaders Under 40; Future vision: Where is manufacturing headed?; Electrical distribution, redefined
SCADA at the junction, Managing risk through maintenance, Moving at the speed of data
Safety at every angle, Big Data's impact on operations, bridging the skills gap
The digital oilfield: Utilizing Big Data can yield big savings; Virtualization a real solution; Tracking SIS performance
Applying network redundancy; Overcoming loop tuning challenges; PID control and networks
Driving motor efficiency; Preventing arc flash in mission critical facilities; Integrating alternative power and existing electrical systems
Package boilers; Natural gas infrared heating; Thermal treasure; Standby generation; Natural gas supports green efforts

Annual Salary Survey

Before the calendar turned, 2016 already had the makings of a pivotal year for manufacturing, and for the world.

There were the big events for the year, including the United States as Partner Country at Hannover Messe in April and the 2016 International Manufacturing Technology Show in Chicago in September. There's also the matter of the U.S. presidential elections in November, which promise to shape policy in manufacturing for years to come.

But the year started with global economic turmoil, as a slowdown in Chinese manufacturing triggered a worldwide stock hiccup that sent values plummeting. The continued plunge in world oil prices has resulted in a slowdown in exploration and, by extension, the manufacture of exploration equipment.

Read more: 2015 Salary Survey

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.
This article collection contains several articles on the vital role of plant safety and offers advice on best practices.
This article collection contains several articles on the Industrial Internet of Things (IIoT) and how it is transforming manufacturing.
This article collection contains several articles on strategic maintenance and understanding all the parts of your plant.
click me