Back to Basics: Simplify device-level wiring

Faster connectivity, data monitoring, and circuit protection are among advantages of device-level wiring solutions.

03/23/2011


Innovative, user-friendly, device-level networks can provide original equipment manufacturers (OEMs) with an intelligent connecting solution that reduces commissioning time, improves wiring accuracy, and simplifies troubleshooting. Ultimately, they can help to drive increased profitability. That said, not all networking solutions are well suited for use within a control panel. Control panels perform a wide range of applications and have specific connectivity requirements that are not adequately handled by every network. Consider the following criteria:

  • Simple connectivity. Is the cable media flexible enough to route to the devices in the panel? Ensure the connectors are easy to locate and connect to the cable. To minimize setup time, the connecting solution can have auto-addressing capabilities as well as accommodate both device control and power needs. Furnishing the panel building process with new solutions can improve throughput and profitability. Lastly, to ensure simple connectivity, the cable media should be able to extend both inside and outside of the control cabinet.
  • Composition of I/O connections. The composition of the I/O connections will determine which type of device-level network is best suited for a control panel. Does the control panel I/O consist primarily of motor-control type connections (like motor starters, contactors, relays, and pilot devices)? Or, is more than a third of the I/O connected to position sensors? Networks that are primarily composed of motor starters and pilot devices can use connecting solutions that have a built-in communication system and integral diagnostics, allowing you to easily troubleshoot and improve wiring accuracy. On the other hand, control systems which require numerous sensor inputs may be better served with device-level networks that include quick-connect type cable connections and cord sets.
  • Data monitoring. Increasingly, end users want data monitoring on some or all of their motor loads. In traditional PLC-control systems, this data is provided by current transformers (CTs), which are wired back to analog inputs on the PLC. Device-level networks can connect to electronic manual motor protectors (MMPs) or overload relays—the information can be monitored over the network, without using CTs or analog inputs to the PLC. Furthermore, the space requirements for electronic versus electromechanical MMPs or overload relays is about the same, so it is feasible to upgrade or retrofit control panels and/or to have this option on a larger number of motor loads.
  • Eaton SmartWire-DTTM panel wiring solutionDesign flexibility.  Does the end user specify the preferred brand of programmable logic controller (PLC)? How does this impact engineering, documentation, and panel layout? Smart, device-level networks can help to standardize the control panel by eliminating the need for traditional PLC input/output (I/O) modules and use motor control components that can connect directly to the network. There’s no need to reconfigure the control panel layout and wiring for different PLCs.
  • Control circuit protection. Is it difficult to troubleshoot after someone changes the panel wiring after installation? How do you prevent someone from bypassing or removing the safety interlocks that are part of the control design? Today’s device-level networks can deter unauthorized wiring changes and help prevent control wiring interlocking from being bypassed or jumpered. Additionally, device-level networks employed today can continuously monitor all devices on the network and detect changes in status or configuration.
  • Standardization. Do you build multiple control panels that have the same or similar configurations? Do you offer optional devices for the control panels? Do you have to reengineer to change the panel wiring to accommodate these options? Intelligent, device-level networks speed design, assembly, test, and commissioning by eliminating or reducing point-to-point wiring and use quick connectors to connect control devices. They can significantly reduce the wiring effort required to build panels; some allow you to replicate the connection wiring harness—saving costs and time. They allow programming of the optional features in advance, automatically detecting when optional devices are present. This allows you to have one PLC control program, one wiring layout or connection harness, and control panels that can be easily be field upgraded.

 

- Richard Chung is product manager at Eaton.

DID YOU APPLY FOR, TURN IN A CONTROL PANEL DESIGN TUTORIAL VIDEO? www.controleng.com/controlpanelcontest



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.
Electric motor power measurement and analysis: Understand the basics to drive greater efficiency; Selecting the right control chart; Linear position sensors gain acceptance
Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.