Automation legalities: Papering the maintenance relationship

Automation providers cover the "maintenance and service" relationship in three basic ways. Learn the five basic legal clauses, starting with payment.

09/06/2012


Don't puzzle over automation legalitiesHow does an automation provider put in writing the "maintenance and service" relationship?

As I see it, there are three types of maintenance and service agreements. The first is an alternate within the original design and installation agreement. Check the box, pay this amount, and the "maintenance and service" scope is added.

The second is via an independent written contract (the best choice if you were polling attorneys).

The third option—and far and away the most common—involves simply picking up the phone, listening to the immediate issue, and jumping into the fray whenever it makes sense to do so (call this a "callback" relationship). The agreement? There is not much of one to speak of—you are the customer, your satisfaction is important to us, and we will try to get the thing up and running to do what you want it to do. Never mind that there may be some muddiness as to whether this is original scope, a warranty call, a retrofit, an upgrade, or maintenance for a fee.

Each of these arrangements has its strengths and weaknesses from the perspective of the automation provider.

First-rate maintenance and service agreements are not off the shelf, but tailored to the application in question—rarely will a generic master service agreement do the job well. The must-have "legal clauses" fall into two categories: those that are specific to the maintenance relationship and those that are not.

Legal clauses

The sections particular to maintenance contracts deal with payment, definitions, warranties, exclusions, and what I call "response boundaries." Those of a general character (call these "the usual suspects") address limitations on liability, termination, confidentiality, force majeure, disputes, and completeness. Only the former set of five legal clauses will be discussed here.

1. Payment. The payment terms available for maintenance and service agreements are superficially the same as those for automation contracts generally—lump sum, guaranteed max, and cost plus—with two important forewarnings. The first is that there is inherently an open-ended quality to the scope of these agreements that argues for time and material billing. The second is a competing dynamic—the fact that end users (like car owners) view the maintenance and service relationship as a sort of protective shield, arguing for closure (pay this fee and you do not need to worry any more). Given these opposing forces, the guaranteed max (or some variation on that theme) or lump sum with hours threshold and fixed rates are acceptable compromises.

2. Definitions. Certain contractual terms cannot be left to themselves in a successful maintenance and service relationship. Most important are defining the precise extent of the "covered system" in question, the boundaries between "customized" and "third-party" software, and the scope and nature of the services themselves.

3. Warranties. Of all the boundaries between original scope (design/installation) and maintenance, none is more fraught with difficulty than the line involving warranties. No end user wants to be invoiced for that which would be free in the absence of the extended service agreement; no integrator wants to be denied payment for additional work because the end user is unfairly raising the warranty flag.

4. Exclusions. Related to this is the need to carve out what is not covered by the maintenance agreement. Services provided to someone other than the end user certainly are not. So is migration from one platform to another. Upgrades are either in or out depending on the system (and what type of upgrade we are talking about).

[subhead] More exclusions

It also may be wise to exclude the following:

  • Services arising from an end user's failure to maintain an installation and operating environment in accordance with the system documentation
  • Service arising from damage occurring to the system or any of its parts beyond ordinary wear and tear, including accidents; unusual physical, electrical, or electromagnetic stress; neglect; misuse; failure or fluctuation of electric power, air conditioning or humidity control; excessive heating; natural disasters such as fire, flood, wind, earthquake, or lightning accident; or fire and smoke damage.
  • Services that involve deviating from the best practices of the control system industry. 

5. Response boundaries. A final type of boundary is the one involving responsiveness to end-user needs. Inherently the maintenance relationship has a response-reaction facet that is minimized if the integrator has a facility presence but is maximized if there is none. How quickly is a response required? It depends on the correct response. One way of structuring this aspect of the relationship is to define degrees of magnitude right there in the agreement (defining the difference between an emergency and a low-priority fix—and calibrating the sometimes considerable distance between them).

Mark Voigtmann, Faegre Baker Daniels- Mark Voigtmann leads the automation practice at Faegre Baker Daniels, a law firm with offices in the U.S., the U.K., and China. Follow Mark's regular posts on legal issues at twitter.com/automationlaw or reach him at Mark.Voigtmann(at)faegrebd.com or 317-237-1265.

Edited by Mark T. Hoske, content manager, CFE Media, Control Engineering and Plant Engineering, mhoske(at)cfemedia.com.

ONLINE

See related video clip http://bit.ly/P8kmTl



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.