Automation improves alternator test system

Inside Machines: Motorcar Parts of America, an autoparts rebuilder, decided to design and build a new testing system in house using a programmable automation controller (PAC) and human machine interface (HMI). An auto parts rebuilder used off-the-shelf automation components to test remanufactured alternators quickly and efficiently.

05/20/2014


Figure 1: Electrical and data connections are made between the test system and the alternator after it’s mounted in the test stand. An AutomationDirect GS drive controls the speed as needed, although making the right connection to the Ethernet-based PAC rWhen Motorcar Parts of America decided it needed a new testing system for its alternators, the company knew it would need a custom application. Therefore, the engineering team decided to design and build the system in house using a programmable automation controller (PAC) with a human machine interface (HMI).

To transform the raw data collected into a form the PAC would understand, we added numerous signal conditioners, solid-state relays, and other interfaces. This enabled us to thoroughly test all our alternators. When an alternator goes bad, most mechanics will replace it with a used unit that has been remanufactured, and it might have come from our company, Motorcar Parts of America (MPA) in Torrance, Calif. Given the number of units that have come through our shop and the expertise we've gained, many of our remanufactured alternators are better than the original as we have found ways to eliminate many design weaknesses over the years.

The practice of rebuilding engines and subassemblies has been going on for decades, and MPA is a major supplier of replacement starters, alternators, wheel hub assemblies, and bearings. As engines have become more sophisticated, so has the remanufacturing and testing process.

Rebuilding an alternator from a current or recent model car is a complex process, one that virtually demands thorough testing to ensure that performance demands are met. Given the cost pressures always present in anything related to the automotive industry, companies that want to compete as rebuilders must be able to carry out the remanufacturing and test processes quickly and predictably. Mechanics and auto part store chains will quickly drop a supplier that causes customer dissatisfaction by supplying substandard components, so world-class quality is a must.

There are thousands of alternator types in use given the variety and age of cars on the road. Even so, as part of our customer service, MPA promises 100% end-of-line testing of all remanufactured alternators. Handling a huge range of sizes, capacities, and case design form factors requires an automated testing procedure that can step through and record a series of tests faster and more positively than with manual operations, which is why we employ automated test systems. 

Custom built test system

Since an automated alternator test system isn't an off-the-shelf item, MPA has had to design and build much of its own test equipment. At present, MPA has rebuilding and testing recipes for more than 3,000 alternator models. This includes parts catalogs, performance parameters, test protocols, and other information. To implement these test recipes in an automated fashion, MPA recently installed a new alternator test bench, built in-house with the help of automation distributor and system integrator Quantum Automation in Anaheim, Calif.

Any company with a complex project needs to choose the right vendors to supply the required hardware and software components. To assist in the selection process, we chose Quantum Automation because of a sales support staff that we knew would point us in the right direction.

In a world driven by evolving technology and constant changes with new applications and solutions, it is necessary to consult with highly trained and trusted partners before beginning any automation project. Skirting this step could result in sourcing the wrong hardware or software.

Testing a given alternator requires mounting it in the test stand, generally using the same mounts that are used with the engine. This requires drop-in retainer inserts that mate with each specific alternator case design. Electrical connections have to be made to simulate a load (Figure 1), along with data connections that communicate with the ECU (engine control unit).

Figure 2: A programmable automation controller automates the test system, monitors its operation and gathers test data. High processing speeds, sophisticated data handling, and high-level programming options were a must to meet system requirements. A sophThe testing protocol includes spinning the alternator at specified RPM values and checking its output in volts and amps, both ac and dc. Running an alternator at full load requires the safe dissipation of high currents. A unit for a luxury SUV has to be able to power a huge number of accessories, so total output can easily be 200 A or more. The testing machine also has to talk to the unit, giving it digital instructions and receiving information using CAN bus, just as the ECU would in normal use in a vehicle. 

Driven by a stock controller

A sophisticated controller is the heart of the test system, in this case a programmable automation controller (PAC, Figure 2). Operators control and monitor the test system via a touchscreen PC running web-based human machine interface (HMI) software, and the PC is connected to the PAC via Ethernet (Figure 3).

All of the testing parameters have to be programmed into the PAC, with some of the more commonly used programming routines standardized as function blocks for reuse from one program to another. An in-house designed printed circuit board communicates CAN-based data to the alternator that simulates what the engine would send in normal use.

Figure 3: The test system includes a touchscreen PC running HMI software, which allows operators to select recipes and perform other interactions with the system. Operators control and monitor the test system via a touchscreen PC running Web Studio HumanThe test system also has a main drive motor that spins the rotor. Given the variety of units that must be tested, the motor has to operate over a wide speed range to match what the alternator would see in normal use. An ac drive controls the speed as needed, although making the right connection to the Ethernet-based PAC required conversion to the RS485 serial communication required by the drive. 

Designed for easy operation

In day-to-day use, an operator has a production lot of specific alternators to test. After inserting the correct mount to affix the alternator to the test stand, the operator calls up the parameters for the specific alternator from more than 3000 alternators in the database using the touchscreen HMI. The HMI provides the appropriate test screens for the specific alternator, and the operator interacts with the HMI as required during the test procedure (Figure 4).

The test system first performs its own self-diagnostic before beginning the actual testing process. If a specific alternator fails, the test system is sophisticated enough to diagnose which component failed or if there is another defect. It can identify this by determining which step the process was on when the failure was spotted. The quality technicians can then trace down the root cause and see if it was a component failure or some other issue. Appropriate corrective actions can then be performed according to MPA's test procedures.

The testing program has to be fast and reliable. Once set up, testing technicians can completely test a unit in less than 90 seconds, performing about 1000 tests per day. These 1000 tests generate upwards of 250,000 total data points, and all of that information is uploaded to a larger database in the corporate server database. 

Handling large amounts of data

Figure 4. The touchscreen HMI is programmed to lead the operator through the test procedure by following a series of logical steps. After using the AutomationDirect Productivity3000 PAC and the Indusoft Web Studio software, other parts of MPA manufacturinGiven that the test system has about 100 I/O points and given the amount of data that has to be gathered in a short time, the PAC and the HMI have to process the data quickly and efficiently. This is complicated further since the kind of data collected when testing an alternator is different than what is typical with most industrial automation systems.

So, we had to add numerous signal conditioners, solid-state relays, and other interfaces to convert the alternator test data into formats that the PAC can handle. Communications between the PAC and the HMI also have to be quick, which isn't a problem due to 100 MB Ethernet communications.

Designing, building, and programming a unit of this complexity was not an easy undertaking, but doing it using standard industrial hardware and software made for a relatively inexpensive project. In years past, the only practical approach was using proprietary hardware and software that was more costly, more difficult to program, and harder to maintain. Earlier versions of a test system with this level of complexity would typically have cost two or three times what this one did, and would not have had the same capabilities. That's the value of using off-the-shelf components to build a custom system.

Based on our experience using the PAC and the web-based HMI software, we are looking at other parts of our manufacturing and test processes where we can increase production or improve quality through a higher level of automation. The ability to design, build, and program production and test systems like this in-house using primarily off-the-shelf industrial automation products has given us a lower cost threshold, allowing us to consider applications that we would have considered uneconomical before.

- Bernie Galhoff is senior electrical engineer, Motorcar Parts of America. Edited by Mark T. Hoske, content manager, CFE Media, Control Engineering, mhoske(at)cfemedia.com.

Key concepts

  • MPA testing technicians can completely test a unit in less than 90 seconds, performing about 1000 tests per day.
  • Ability to design, build, and program production and test systems in-house using primarily off-the-shelf industrial automation products provides a lower cost threshold.
  • Lower cost automation enables projects considered uneconomical before.

Consider this

What un-automated areas of your facility could benefit from low-cost, off-the-shelf automation?

ONLINE extra

AutomationDirect 

InduSoft 

Motorcar Parts of America (MPA) 

Quantum Automation 

Case studies: See related automation application stories below.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.