SEARCH Archives
Loading
Sponsored by:

ASHRAE provides guidance on energy audits

ASHRAE's second edition of Procedures for Commercial Building Energy Audits provides advice for engineers, energy auditors, building owners, managers, and government entities.

12/06/2011


ASHRAE has released updated guidance on building energy audits. While energy audits are a commonly used component of the industry, there is great diversity in the services delivered to customers, and little industry standardization. The second edition of Procedures for Commercial Building Energy Audits promotes best practices, provides “how-to’s” and fills a void in available information for engineers, building owners, managers and government entities. The new publication includes time-saving tips for energy auditors, how to hire an auditor, what to ask for in a comprehensive audit report and how to build a successful energy efficiency retrofit team.

“As we work to reduce energy consumption in our commercial buildings, we want to ensure that recommendations are cost effective, technically feasible, maintain safety and comfort and result in significant energy savings” Jim Kelsey, a member of Technical Committee 7.6, Building Energy Performance, and who oversaw the writing of the updated publication, said. “This volume focuses on how to improve energy audit best practices. Providing the best audits that we can will help move the industry forward to net zero buildings.”

Additionally, the publication addresses how to build a successful team, analytical methods, successful approaches to site visits, incorporating on-site measurements, economic evaluation of measures and how to organize an energy audit report that promotes action on the part of building owners and managers. It includes many tips for conducting energy audits and reviewing results prepared by others. For example, the top things to check for in when reviewing an audit report include verifying that:

  • Proposed measures are feasible and appropriate for the building;
  • Proposed measures meet applicable building codes;
  • Data are internally consistent;
  • Savings estimate methods follow established principles and methods;
  • Estimates of potential energy savings are reasonable compared to quick estimates and historical energy use;
  • Proposed cost estimates are reasonable relative to field experience;
  • Interactions between EEMs are identified and addressed;recommendations and report meet the project scope, goals and client’s needs;
  • Any financial discussion includes current and viable mechanisms available per the tax structure, location, and motivations of the client.

Another benefit of the new publication is a greatly expanded section of forms and template analyses, including “live” Excel spreadsheets, checklists and equipment-specific forms suitable for field collection of detailed commercial building data.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
2013 Forecast Issue: A shift in manufacturing
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results


Poll of the Week

What category most helps you select new products?
Recommendation from colleagues
Product of the Year winners
Supplier information
Trade show visit


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.